Constructions near Search Center
2024-10-08
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork on I-85 S from SC-14/Exit 56 (I-85) to I-385/Exit 51 (I-85).
Roadwork on I-85 S from SC-14/Exit 56 (I-85) to I-385/Exit 51 (I-85).
Start Time: 2024-05-13T12:31:00.000-04:00
End Time: 2024-06-19T07:51:35.672-04:00
map local traffic - MAPRoadwork on Aviation Pkwy at GSP Dr.
Roadwork on Aviation Pkwy at GSP Dr.
Start Time: 2024-06-17T19:53:00.000-04:00
End Time: 2024-06-19T07:51:35.672-04:00
map local traffic - MAP1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
Start Time: 2022-06-15T00:00:00.000-04:00
End Time: 2024-06-30T23:59:59.000-04:00
map local traffic