Constructions near Junction at Beatrice Dr

click anywhere on map to find more Constructions

 
 
 

Current Constructions
  • MAP
    SR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
    SR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
    Start Time: 2025-05-17T22:01:30.000-04:00
    End Time: 2025-07-20T00:59:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork from State Route 4 to Stanley Ave.
    Roadwork from State Route 4 to Stanley Ave.
    Start Time: 2025-05-17T15:44:00.000-04:00
    End Time: 2025-05-21T06:23:20.757-04:00
    maplocal traffic
  • MAP
    Wagner-Ford Road to I-75 Southbound . The Ramp from Wagner-Ford Road to I-75 South will be closed from Sunday, August 24, 2024 through June 2025. This closure is necessary to reconstruct I-75 in this area. Detour: From 2024-08-24 to 2026-10-30, between 12:00 AM and 11:59 PM, Wagner Ford Road to Keowee/N. Dixie Dr. to Stanley Ave.
    Wagner-Ford Road to I-75 Southbound . The Ramp from Wagner-Ford Road to I-75 South will be closed from Sunday, August 24, 2024 through June 2025. This closure is necessary to reconstruct I-75 in this area. Detour: From 2024-08-24 to 2026-10-30, between 12:00 AM and 11:59 PM, Wagner Ford Road to Keowee/N. Dixie Dr. to Stanley Ave.
    Start Time: 2025-05-13T05:16:30.000-04:00
    End Time: 2026-10-31T00:59:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on National Rd from Reese Dr / 8th St to Grange Hall Rd / Colonel Glenn Hwy.
    Roadwork on National Rd from Reese Dr / 8th St to Grange Hall Rd / Colonel Glenn Hwy.
    Start Time: 2025-05-13T03:52:51.000-04:00
    End Time: 2025-05-21T06:23:20.757-04:00
    maplocal traffic