know it ahead ™ ...

Constructions near Junction at Center Rd

click anywhere on map to find more Constructions

 
 
 

Current Constructions
  • MAP
    CT-53 / Newtown Ave is closed from US-1 (CT-53) to Newtown Ave (CT-53).
    CT-53 / Newtown Ave is closed from US-1 (CT-53) to Newtown Ave (CT-53).
    Start Time: 2024-06-18T06:12:38.000-04:00
    End Time: 2024-06-20T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Mill Plain Rd is closed from Brookside Dr to Round Hill Rd.
    Mill Plain Rd is closed from Brookside Dr to Round Hill Rd.
    Start Time: 2024-06-18T06:21:00.000-04:00
    End Time: 2024-06-20T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Seaview Ave is closed from Barnum Ave to US-1/Boston Ave.
    Seaview Ave is closed from Barnum Ave to US-1/Boston Ave.
    Start Time: 2024-06-17T12:40:56.000-04:00
    End Time: 2024-06-20T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Seaview Ave is closed from US-1/Boston Ave to Barnum Ave.
    Seaview Ave is closed from US-1/Boston Ave to Barnum Ave.
    Start Time: 2024-06-17T12:02:02.000-04:00
    End Time: 2024-06-20T23:59:00.000-04:00
    maplocal traffic
  • MAP
    CT DOT-Bridgeport-Oper: bridge replacement on LONGBROOK AVE both directions between US-1 (Stratford) and COTTAGE PL (Stratford) Traffic will be detoured onto Route 1 (Barnum Avenue Cutoff), then onto Main Street, and finally back onto Longbrook Avenue., Continuous Monday June 17th, 2024 12:00 AM thru Wednesday July 17th, 2024 11:59 PM All lanes closed
    CT DOT-Bridgeport-Oper: bridge replacement on LONGBROOK AVE both directions between US-1 (Stratford) and COTTAGE PL (Stratford) Traffic will be detoured onto Route 1 (Barnum Avenue Cutoff), then onto Main Street, and finally back onto Longbrook Avenue., Continuous Monday June 17th, 2024 12:00 AM thru Wednesday July 17th, 2024 11:59 PM All lanes closed
    Start Time: 2024-06-17T00:00:00.000-04:00
    End Time: 2024-07-17T23:59:00.000-04:00
    maplocal traffic
  • MAP
    CT DOT-Bridgeport-Oper: bridge replacement on LONGBROOK AVE both directions between US-1 (Stratford) and COTTAGE PL (Stratford) Traffic will be detoured onto Route 1 (Barnum Avenue Cutoff), then onto Main Street, and finally back onto Longbrook Avenue., Continuous Monday June 17th, 2024 12:00 AM thru Wednesday July 17th, 2024 11:59 PM All lanes closed
    CT DOT-Bridgeport-Oper: bridge replacement on LONGBROOK AVE both directions between US-1 (Stratford) and COTTAGE PL (Stratford) Traffic will be detoured onto Route 1 (Barnum Avenue Cutoff), then onto Main Street, and finally back onto Longbrook Avenue., Continuous Monday June 17th, 2024 12:00 AM thru Wednesday July 17th, 2024 11:59 PM All lanes closed
    Start Time: 2024-06-17T00:00:00.000-04:00
    End Time: 2024-07-17T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
    Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
    Start Time: 2024-05-20T09:00:00.000-04:00
    End Time: 2025-06-20T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
    Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
    Start Time: 2024-05-20T09:00:00.000-04:00
    End Time: 2025-06-20T23:59:00.000-04:00
    maplocal traffic
  • MAP
    CT DOT-Newington-HWY-Oper Ctr: construction on CT-58 both directions between LAKEWOOD DR (Fairfield) and CONGRESS ST (Fairfield) Nighttime lane closures, Friday April 12th, 2024 thru Tuesday October 1st, 2024, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open
    CT DOT-Newington-HWY-Oper Ctr: construction on CT-58 both directions between LAKEWOOD DR (Fairfield) and CONGRESS ST (Fairfield) Nighttime lane closures, Friday April 12th, 2024 thru Tuesday October 1st, 2024, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open
    Start Time: 2024-04-12T21:00:00.000-04:00
    End Time: 2024-06-19T06:00:00.000-04:00
    maplocal traffic
  • MAP
    Slow traffic on I-95 S from Sherwood Island Rd/Exit 18 (I-95) to US-1/Connecticut Ave/Exit 14 (I-95) due to roadwork.
    Slow traffic on I-95 S from Sherwood Island Rd/Exit 18 (I-95) to US-1/Connecticut Ave/Exit 14 (I-95) due to roadwork.
    Start Time: 2024-06-19T05:38:30.000-04:00
    End Time: 2024-06-19T10:40:30.000-04:00
    maplocal traffic
  • MAP
    Slow traffic on I-95 S from Sherwood Island Rd/Exit 18 (I-95) to US-1/Connecticut Ave/Exit 14 (I-95) due to roadwork.
    Slow traffic on I-95 S from Sherwood Island Rd/Exit 18 (I-95) to US-1/Connecticut Ave/Exit 14 (I-95) due to roadwork.
    Start Time: 2024-06-19T05:38:30.000-04:00
    End Time: 2024-06-19T06:25:30.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US