Constructions near Junction at Kev Rob Rd
2024-10-08
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPStationary traffic on OH-60 / S River Rd from Bridge St (Main St/S River Rd/OH-60) to OH-376/North St (S River Rd/OH-60) due to roadwork.
Stationary traffic on OH-60 / S River Rd from Bridge St (Main St/S River Rd/OH-60) to OH-376/North St (S River Rd/OH-60) due to roadwork.
Start Time: 2024-06-19T05:44:30.000-04:00
End Time: 2024-06-19T06:16:30.000-04:00
map local traffic - MAP5th Street off-ramp eastbound. The 5th Street off-ramp from I-70 EB is closed to traffic during reconstruction of the Muskingum River bridge.
5th Street off-ramp eastbound. The 5th Street off-ramp from I-70 EB is closed to traffic during reconstruction of the Muskingum River bridge.
Start Time: 2023-10-31T01:00:00.000-04:00
End Time: 2025-09-02T00:59:00.000-04:00
map local traffic - MAPRoadwork on OH-60 / S River Rd from OH-376/North St (S River Rd/OH-60) to Bridge St (Main St/S River Rd/OH-60).
Roadwork on OH-60 / S River Rd from OH-376/North St (S River Rd/OH-60) to Bridge St (Main St/S River Rd/OH-60).
Start Time: 2024-05-23T17:45:00.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPSR 60 southbound of Gaysport. SR 60 is restricted to one lane with a temporary signal for reconstruction of the roadway.
SR 60 southbound of Gaysport. SR 60 is restricted to one lane with a temporary signal for reconstruction of the roadway.
Start Time: 2024-03-28T01:00:00.000-04:00
End Time: 2024-07-02T00:59:00.000-04:00
map local traffic