Constructions near Search Center
2025-06-02
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPBridge rehabilitation and deck work on I-90 both directions at Van Hoesen Rd Overpass (Schodack), Continuous Monday March 31st, 2025 12:00 AM thru Saturday November 15th, 2025 11:59 PM 1 Right lane of 2 lanes closed
Bridge rehabilitation and deck work on I-90 both directions at Van Hoesen Rd Overpass (Schodack), Continuous Monday March 31st, 2025 12:00 AM thru Saturday November 15th, 2025 11:59 PM 1 Right lane of 2 lanes closed
Start Time: 2025-05-05T09:05:47.000-04:00
End Time: 2025-11-16T04:59:00.000-05:00
map local traffic - MAPRoadwork on Berkshire Spur E from I-87 (NY State Thruway Berkshire Spur) to I-90/Exit B1 (NY State Thruway Berkshire Spur).
Roadwork on Berkshire Spur E from I-87 (NY State Thruway Berkshire Spur) to I-90/Exit B1 (NY State Thruway Berkshire Spur).
Start Time: 2025-04-28T13:05:00.000-04:00
End Time: 2025-06-02T08:50:03.782-04:00
map local traffic - MAPNYSDOT TMC - Albany: Construction , pothole repair on I-87 Northway southbound between Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) and ADIRONDACK NORTHWAY at US-20 (Guilderland) 1 Left lane of 3 lanes closed until 12:00 PM
NYSDOT TMC - Albany: Construction , pothole repair on I-87 Northway southbound between Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) and ADIRONDACK NORTHWAY at US-20 (Guilderland) 1 Left lane of 3 lanes closed until 12:00 PM
Start Time: 2025-01-27T09:15:00.000-05:00
End Time: 2025-06-02T08:50:03.782-04:00
map local traffic