Constructions near Junction at County Road 1125B
2024-10-09
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPAll traffic reduced to one lane, two-way traffic control in place, be prepared to stop. Long term closure using traffic light signals on each end of closure
All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. Long term closure using traffic light signals on each end of closure
Start Time: 2024-05-07T12:21:00.000-05:00
End Time: 2024-06-30T23:00:00.000-05:00
map local traffic