Constructions near Junction at Old Nona Road
2024-10-10
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPTravel lanes reduced to one lane. US96 NBML the bridge over BU-96 and BNSF railroad starting June 10, 2024, until August 30, 2024, the inside main lane will need a wide load restriction load can’t be over 14’ft. The barrier wall (4’-8”) in height.
Travel lanes reduced to one lane. US96 NBML the bridge over BU-96 and BNSF railroad starting June 10, 2024, until August 30, 2024, the inside main lane will need a wide load restriction load can’t be over 14’ft. The barrier wall (4’-8”) in height.
Start Time: 2024-06-10T20:52:00.000-05:00
End Time: 2024-08-30T22:00:00.000-05:00
map local traffic