know it ahead ™ ...

Constructions near Junction at Watrous St

click anywhere on map to find more Constructions

 
 
 

Current Constructions
  • MAP
    Roadwork on Aircraft Rd from Middletown to Maromas Rd.
    Roadwork on Aircraft Rd from Middletown to Maromas Rd.
    Start Time: 2025-05-19T11:40:30.000-04:00
    End Time: 2025-05-20T08:05:52.325-04:00
    maplocal traffic
  • MAP
    Paving operations on CT-66 eastbound between CAMP ST (Middletown) and westbound WASHINGTON ST at CT-17 (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
    Paving operations on CT-66 eastbound between CAMP ST (Middletown) and westbound WASHINGTON ST at CT-17 (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
    Start Time: 2025-04-06T20:00:00.000-04:00
    End Time: 2025-11-08T04:59:00.000-05:00
    maplocal traffic
  • MAP
    Paving operations on CT-17 both directions between RANDOLPH RD (Middletown) and LOVELAND ST (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
    Paving operations on CT-17 both directions between RANDOLPH RD (Middletown) and LOVELAND ST (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
    Start Time: 2025-04-06T20:00:00.000-04:00
    End Time: 2025-11-08T04:59:00.000-05:00
    maplocal traffic
  • MAP
    Traffic shift on CT-82 both directions between CT-154 (Haddam) and CT-82 (Haddam) shift traffic on the Route 82 connector to the southeast and reduce the roadway to 1 lane in each direction at the intersection of Route 154., Continuous Friday June 21st, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
    Traffic shift on CT-82 both directions between CT-154 (Haddam) and CT-82 (Haddam) shift traffic on the Route 82 connector to the southeast and reduce the roadway to 1 lane in each direction at the intersection of Route 154., Continuous Friday June 21st, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
    Start Time: 2024-06-21T00:00:00.000-04:00
    End Time: 2025-11-03T04:59:00.000-05:00
    maplocal traffic
  • MAP
    CT DOT-Newington-HWY-Oper Ctr: construction on CT-154 both directions between CT-82 (Haddam) and CT-82 at CT-82 (Haddam) motorists should expect to travel on a gravel roadway during this time, Continuous Monday September 9th, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
    CT DOT-Newington-HWY-Oper Ctr: construction on CT-154 both directions between CT-82 (Haddam) and CT-82 at CT-82 (Haddam) motorists should expect to travel on a gravel roadway during this time, Continuous Monday September 9th, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
    Start Time: 2024-06-21T00:00:00.000-04:00
    End Time: 2025-11-02T23:59:00.000-05:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US