Constructions near Junction at County Road 7600
2024-10-07
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPFM 1585 / FM-1585 is closed from Quaker Ave (FM-1585) to Indiana Ave (FM-1585).
FM 1585 / FM-1585 is closed from Quaker Ave (FM-1585) to Indiana Ave (FM-1585).
Start Time: 2024-06-03T08:40:30.000-05:00
End Time: 2024-06-19T06:51:41.897-05:00
map local traffic - MAPFM 1585 / FM-1585 is closed from Indiana Ave (FM-1585) to Quaker Ave (FM-1585).
FM 1585 / FM-1585 is closed from Indiana Ave (FM-1585) to Quaker Ave (FM-1585).
Start Time: 2024-06-03T08:36:30.000-05:00
End Time: 2024-06-19T06:51:41.897-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Motorists should expect delays. For the rehabilitation and reconstruction of existing roadway. Consisting of milling SMA/HMA, full-depth reconstruction of sidewalks, curb ramps, signing and striping, drainage structures, illumination and traffic signals.
Lanes closed to traffic, detour in place. Motorists should expect delays. For the rehabilitation and reconstruction of existing roadway. Consisting of milling SMA/HMA, full-depth reconstruction of sidewalks, curb ramps, signing and striping, drainage structures, illumination and traffic signals.
Start Time: 2022-06-14T13:00:00.000-05:00
End Time: 2025-12-01T23:00:00.000-06:00
map local traffic - MAPWatch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Watch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Start Time: 2021-11-01T13:00:00.000-05:00
End Time: 2026-10-30T22:00:00.000-05:00
map local traffic - MAPWatch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Watch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Start Time: 2021-11-01T13:00:00.000-05:00
End Time: 2026-10-30T22:00:00.000-05:00
map local traffic - MAPWatch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Watch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Start Time: 2021-11-01T13:00:00.000-05:00
End Time: 2026-10-30T22:00:00.000-05:00
map local traffic - MAPWatch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Watch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Start Time: 2021-11-01T13:00:00.000-05:00
End Time: 2026-10-30T22:00:00.000-05:00
map local traffic