Constructions near Junction at Cream St
2025-05-19
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPTRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
TRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
Start Time: 2025-05-19T00:00:00.000-04:00
End Time: 2025-05-23T23:59:59.000-04:00
map local traffic - MAPI-91 SB in Fairlee at Exit 15, bridge replacement project for Bridge 56S (over Lake Morey Road). Lane closures in the area to aid in the construction of crossovers. Traffic will be diverted to the NB side in Spring 2025. Drive with care in the area.
I-91 SB in Fairlee at Exit 15, bridge replacement project for Bridge 56S (over Lake Morey Road). Lane closures in the area to aid in the construction of crossovers. Traffic will be diverted to the NB side in Spring 2025. Drive with care in the area.
Start Time: 2025-04-29T07:37:44.000-04:00
End Time: 2025-10-17T21:00:00.000-04:00
map local traffic