Constructions near Junction at Hobbysville Rd
2024-10-09
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAP1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
Start Time: 2022-06-15T00:00:00.000-04:00
End Time: 2024-06-30T23:59:59.000-04:00
map local traffic