Constructions near I 95 exit 26
2025-02-22
Roadnow
click anywhere on map to find more Constructions

Current Constructions
- MAPSunken Meadow Pkwy is closed from End of Controlled Acc (Sunken Meadow Pkwy) to NY-25A/Exit SM5 E (Sunken Meadow Pkwy).
Sunken Meadow Pkwy is closed from End of Controlled Acc (Sunken Meadow Pkwy) to NY-25A/Exit SM5 E (Sunken Meadow Pkwy).
Start Time: 2025-02-21T20:08:30.000-05:00
End Time: 2025-02-22T07:44:48.283-05:00
map local traffic - MAPRoadwork on I-95 S from Elm St/Exit 8 (I-95) to Greenwich Ave/Exit 7 (I-95).
Roadwork on I-95 S from Elm St/Exit 8 (I-95) to Greenwich Ave/Exit 7 (I-95).
Start Time: 2024-03-11T19:00:00.000-04:00
End Time: 2025-02-22T07:44:48.283-05:00
map local traffic - MAPHunting Ridge Rd is closed from Wildwood Rd/Konandreas Dr to Old Long Ridge Rd.
Hunting Ridge Rd is closed from Wildwood Rd/Konandreas Dr to Old Long Ridge Rd.
Start Time: 2024-08-14T11:35:28.000-04:00
End Time: 2025-12-07T08:00:00.000-05:00
map local traffic - MAPBridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open
Bridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open
Start Time: 2023-06-24T09:00:00.000-04:00
End Time: 2025-09-28T23:59:00.000-04:00
map local traffic - MAPBridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open
Bridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open
Start Time: 2023-06-24T09:00:00.000-04:00
End Time: 2025-09-28T23:59:00.000-04:00
map local traffic - MAPSafety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
Start Time: 2024-05-20T09:00:00.000-04:00
End Time: 2025-06-20T23:59:00.000-04:00
map local traffic - MAPSafety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open
Start Time: 2024-05-20T09:00:00.000-04:00
End Time: 2025-06-20T23:59:00.000-04:00
map local traffic