Constructions near Search Center
2025-02-11
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPI-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
I-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
Start Time: 2024-04-15T18:00:00.000-04:00
End Time: 2028-09-01T11:00:00.000-04:00
map local traffic