Roadwork on CT-72 W from CT-372/New Britain Ave (CT-72) to End of Freeway (CT-72). Roadwork on CT-72 W from CT-372/New Britain Ave (CT-72) to End of Freeway (CT-72). Start Time: 2025-05-02T13:16:19.000-04:00 End Time: 2025-06-21T08:23:44.940-04:00 map local traffic
Roadwork on US-202 E / Bantam Rd from Old Turnpike Rd (Bantam Rd/US-202) to CT-209/Bantam Lake Rd (Bantam Rd/US-202). Roadwork on US-202 E / Bantam Rd from Old Turnpike Rd (Bantam Rd/US-202) to CT-209/Bantam Lake Rd (Bantam Rd/US-202). Start Time: 2025-06-20T19:40:51.000-04:00 End Time: 2025-06-21T08:23:44.941-04:00 map local traffic
CT DOT-Newington-HWY-Oper Ctr: bridge replacement on CT-68 both directions between LAKE GROVE AT DURHAM (Durham) and OZICK DR (Durham), Continuous Monday November 4th, 2024 12:00 AM thru Friday September 19th, 2025 11:59 PM All lanes open CT DOT-Newington-HWY-Oper Ctr: bridge replacement on CT-68 both directions between LAKE GROVE AT DURHAM (Durham) and OZICK DR (Durham), Continuous Monday November 4th, 2024 12:00 AM thru Friday September 19th, 2025 11:59 PM All lanes open Start Time: 2025-06-17T08:19:11.000-04:00 End Time: 2025-09-19T23:59:00.000-04:00 map local traffic
Roadwork on CT-254 / Waterbury Rd from Jackson St (Waterbury Rd) to CT-8/James H Darcey Memorial Hwy (Waterbury Rd). Roadwork on CT-254 / Waterbury Rd from Jackson St (Waterbury Rd) to CT-8/James H Darcey Memorial Hwy (Waterbury Rd). Start Time: 2025-06-06T19:34:07.000-04:00 End Time: 2025-06-21T08:23:44.944-04:00 map local traffic
Paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Start Time: 2025-04-21T09:00:02.000-04:00 End Time: 2026-08-04T23:59:00.000-04:00 map local traffic