CT DOT-Newington-HWY-Oper Ctr: roadwork on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be a lane shift on I-84 eastbound and nightly lane closures, Monday November 4th, 2024 thru Wednesday July 30th, 2025, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open CT DOT-Newington-HWY-Oper Ctr: roadwork on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be a lane shift on I-84 eastbound and nightly lane closures, Monday November 4th, 2024 thru Wednesday July 30th, 2025, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open Start Time: 2025-02-18T20:00:00.000-05:00 End Time: 2025-02-20T06:00:00.000-05:00 map local traffic
Bridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Bridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Start Time: 2023-06-24T09:00:00.000-04:00 End Time: 2025-09-28T23:59:00.000-04:00 map local traffic
Bridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Bridge replacement on US 1 both directions area of Metro North Railroad Bridge (Stratford) Single lane closures , Saturday June 24th, 2023 thru Sunday September 28th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Start Time: 2023-06-24T09:00:00.000-04:00 End Time: 2025-09-28T23:59:00.000-04:00 map local traffic
Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open Start Time: 2024-05-20T09:00:00.000-04:00 End Time: 2025-06-20T23:59:00.000-04:00 map local traffic
Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open Safety improvements and traffic signal repairs on COLLINGWOOD AVE both directions between LOOKOUT DR N (Fairfield) and CAPITOL AVE at CT-59 (Bridgeport) There will be intermittent lane closures, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday May 20th, 2024 thru Friday June 20th, 2025, 06:00 PM thru 10:00 AM All lanes open Start Time: 2024-05-20T09:00:00.000-04:00 End Time: 2025-06-20T23:59:00.000-04:00 map local traffic
Roadwork from Ruden St / Cook Ave to West Haven. Roadwork from Ruden St / Cook Ave to West Haven. Start Time: 2025-02-19T07:11:44.000-05:00 End Time: 2025-02-21T23:59:00.000-05:00 map local traffic
CT DOT-Newington-HWY-Oper Ctr: bridge work on CT-222 both directions between ELIZABETH AVE (Thomaston) There will be alternating one-way traffic on North Main Street from Monday, January 13, 2025, to Monday, March 14, 2025. Traffic control signing patterns and a temporary traffic signal will guide motorists through the work zone., Continuous Monday January 13th, 2025 12:00 AM thru Friday March 14th, 2025 11:59 PM All lanes open CT DOT-Newington-HWY-Oper Ctr: bridge work on CT-222 both directions between ELIZABETH AVE (Thomaston) There will be alternating one-way traffic on North Main Street from Monday, January 13, 2025, to Monday, March 14, 2025. Traffic control signing patterns and a temporary traffic signal will guide motorists through the work zone., Continuous Monday January 13th, 2025 12:00 AM thru Friday March 14th, 2025 11:59 PM All lanes open Start Time: 2025-01-13T00:00:00.000-05:00 End Time: 2025-03-14T23:59:00.000-04:00 map local traffic
CT DOT-Newington-HWY-Oper Ctr: bridge work on CT-222 both directions between ELIZABETH AVE (Thomaston) There will be alternating one-way traffic on North Main Street from Monday, January 13, 2025, to Monday, March 14, 2025. Traffic control signing patterns and a temporary traffic signal will guide motorists through the work zone., Continuous Monday January 13th, 2025 12:00 AM thru Friday March 14th, 2025 11:59 PM All lanes open CT DOT-Newington-HWY-Oper Ctr: bridge work on CT-222 both directions between ELIZABETH AVE (Thomaston) There will be alternating one-way traffic on North Main Street from Monday, January 13, 2025, to Monday, March 14, 2025. Traffic control signing patterns and a temporary traffic signal will guide motorists through the work zone., Continuous Monday January 13th, 2025 12:00 AM thru Friday March 14th, 2025 11:59 PM All lanes open Start Time: 2025-01-13T00:00:00.000-05:00 End Time: 2025-03-14T23:59:00.000-04:00 map local traffic