Constructions near I 70 OH exit 52b a
2025-05-24
Roadnow
click anywhere on map to find more Constructions

Current Constructions
- MAPSR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
SR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
Start Time: 2025-05-17T22:01:30.000-04:00
End Time: 2025-07-20T00:59:00.000-04:00
map local traffic - MAPRoadwork from State Route 4 to Stanley Ave.
Roadwork from State Route 4 to Stanley Ave.
Start Time: 2025-05-17T15:44:00.000-04:00
End Time: 2025-05-24T08:41:42.092-04:00
map local traffic - MAPRoadwork on E 2nd St from N Patterson Blvd to N Saint Clair St.
Roadwork on E 2nd St from N Patterson Blvd to N Saint Clair St.
Start Time: 2025-05-23T07:46:00.000-04:00
End Time: 2025-05-24T08:41:42.098-04:00
map local traffic - MAPRoadwork on National Rd from Reese Dr / 8th St to Grange Hall Rd / Colonel Glenn Hwy.
Roadwork on National Rd from Reese Dr / 8th St to Grange Hall Rd / Colonel Glenn Hwy.
Start Time: 2025-05-13T03:52:51.000-04:00
End Time: 2025-05-24T08:41:42.098-04:00
map local traffic