know it ahead ™ ...

Constructions near I 40 exit 193b a

click anywhere on map to find more Constructions

 
 
 

Current Constructions
  • MAP
    Bridge Maintenance crews will close Woodward Rd. between Angell Rd. and Clairmont lane at pipe # SP 29-2074 for approximately 4 to 6 weeks to replace the existing pipe with a new one. A detour will direct traffic utilizing Angell Rd to Cana Rd.
    Bridge Maintenance crews will close Woodward Rd. between Angell Rd. and Clairmont lane at pipe # SP 29-2074 for approximately 4 to 6 weeks to replace the existing pipe with a new one. A detour will direct traffic utilizing Angell Rd to Cana Rd.
    Start Time: 2025-01-22T09:00:00.000-05:00
    End Time: 2025-02-21T15:30:00.000-05:00
    maplocal traffic
  • MAP
    Bridge Maintenance crews will close Woodward Rd. between Angell Rd. and Clairmont lane at pipe # SP 29-2074 for approximately 4 to 6 weeks to replace the existing pipe with a new one. A detour will direct traffic utilizing Angell Rd to Cana Rd.
    Bridge Maintenance crews will close Woodward Rd. between Angell Rd. and Clairmont lane at pipe # SP 29-2074 for approximately 4 to 6 weeks to replace the existing pipe with a new one. A detour will direct traffic utilizing Angell Rd to Cana Rd.
    Start Time: 2025-01-22T09:00:00.000-05:00
    End Time: 2025-02-21T15:30:00.000-05:00
    maplocal traffic
  • MAP
    NCDOT contract forces will close SR 1003 (High Point Road) between SR 2643 (Union Cross Road) and SR 2679 (Glenn High Road) on Monday, March 13, 2023 for an extended period of time for construction of a new interchange at I-74/US 311 and northern beltway project U-2579AA.  .  Motorists should use caution during this phase of construction and are advised to use Union Cross Road and Glenn High Road as a detour route.   
    NCDOT contract forces will close SR 1003 (High Point Road) between SR 2643 (Union Cross Road) and SR 2679 (Glenn High Road) on Monday, March 13, 2023 for an extended period of time for construction of a new interchange at I-74/US 311 and northern beltway project U-2579AA.  .  Motorists should use caution during this phase of construction and are advised to use Union Cross Road and Glenn High Road as a detour route.   
    Start Time: 2025-01-16T11:45:00.000-05:00
    End Time: 2027-03-30T09:00:00.000-04:00
    maplocal traffic
  • MAP
    The Winston-Salem Department of Transportation and Contractors will close the ramp from Cherry St to US-421 Southbound for construction on the Multi-Use Path project.
    The Winston-Salem Department of Transportation and Contractors will close the ramp from Cherry St to US-421 Southbound for construction on the Multi-Use Path project.
    Start Time: 2025-01-07T09:00:00.000-05:00
    End Time: 2025-07-05T16:00:00.000-04:00
    maplocal traffic
  • MAP
    NCDOT Contractor forces are widening Hanes Mill Road (SR 1672) from just west of Museum Drive to University Parkway (SR 4000). This project includes constructing a roundabout @ Museum Drive, and a new bridge over US52. Please stay alert for periodic nighttime lane closures in the work zone on Hanes Mill Road (SR 1672) Monday through Sunday from 8:00pm - 6:00am.
    NCDOT Contractor forces are widening Hanes Mill Road (SR 1672) from just west of Museum Drive to University Parkway (SR 4000). This project includes constructing a roundabout @ Museum Drive, and a new bridge over US52. Please stay alert for periodic nighttime lane closures in the work zone on Hanes Mill Road (SR 1672) Monday through Sunday from 8:00pm - 6:00am.
    Start Time: 2025-01-30T20:00:00.000-05:00
    End Time: 2025-01-31T06:00:00.000-05:00
    maplocal traffic
  • MAP
    As part of the ongoing construction of the C204399 project near DDCC. Caldcleugh road will be closed north of North Davidson Salvage. A new intersection with US 29/70 is in place north of the closure. Motorists wishing to access DDCC and oversize trucks utilizing the detour for US 29/70 shall use the new intersection of Caldcleugh Rd and US 29/70 north of the closure.
    As part of the ongoing construction of the C204399 project near DDCC. Caldcleugh road will be closed north of North Davidson Salvage. A new intersection with US 29/70 is in place north of the closure. Motorists wishing to access DDCC and oversize trucks utilizing the detour for US 29/70 shall use the new intersection of Caldcleugh Rd and US 29/70 north of the closure.
    Start Time: 2023-04-20T10:13:00.000-04:00
    End Time: 2025-04-18T10:14:00.000-04:00
    maplocal traffic
  • MAP
    As part of the ongoing construction of the C204399 project near DDCC. Caldcleugh road will be closed north of North Davidson Salvage. A new intersection with US 29/70 is in place north of the closure. Motorists wishing to access DDCC and oversize trucks utilizing the detour for US 29/70 shall use the new intersection of Caldcleugh Rd and US 29/70 north of the closure.
    As part of the ongoing construction of the C204399 project near DDCC. Caldcleugh road will be closed north of North Davidson Salvage. A new intersection with US 29/70 is in place north of the closure. Motorists wishing to access DDCC and oversize trucks utilizing the detour for US 29/70 shall use the new intersection of Caldcleugh Rd and US 29/70 north of the closure.
    Start Time: 2023-04-20T10:13:00.000-04:00
    End Time: 2025-04-18T10:14:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US