know it ahead ™ ...

Constructions near I 35 exit 410

click anywhere on map to find more Constructions

 
 
 

Current Constructions
  • MAP
    Roadwork on I-30 E / US-67 N from I-45 exit [46] to exit [56B].
    Roadwork on I-30 E / US-67 N from I-45 exit [46] to exit [56B].
    Start Time: 2025-02-04T17:07:30.000-06:00
    End Time: 2025-02-06T05:46:32.679-06:00
    maplocal traffic
  • MAP
    Multiple right lanes closed. Northbound SS 408 the 2 right lanes and shoulder will be closed between 300' south of Grady Niblo exit ramp to 2300' North of Grady Niblo on ramp from February 3 to February 7 daily, weather permitting
    Multiple right lanes closed. Northbound SS 408 the 2 right lanes and shoulder will be closed between 300' south of Grady Niblo exit ramp to 2300' North of Grady Niblo on ramp from February 3 to February 7 daily, weather permitting
    Start Time: 2025-02-03T15:00:00.000-06:00
    End Time: 2025-02-07T21:30:00.000-06:00
    maplocal traffic
  • MAP
    Sorrell St is closed at Conway St.
    Sorrell St is closed at Conway St.
    Start Time: 2025-02-05T04:01:19.000-06:00
    End Time: 2025-02-12T23:59:00.000-06:00
    maplocal traffic
  • MAP
    Butcher Rd is closed at N Interstate Highway 35 E.
    Butcher Rd is closed at N Interstate Highway 35 E.
    Start Time: 2025-02-03T23:45:49.000-06:00
    End Time: 2025-02-10T23:59:00.000-06:00
    maplocal traffic
  • MAP
    S Trunk Ave is closed from I-30 W / Hickory St to Canton St.
    S Trunk Ave is closed from I-30 W / Hickory St to Canton St.
    Start Time: 2025-02-03T23:28:37.000-06:00
    End Time: 2025-02-10T23:59:00.000-06:00
    maplocal traffic
  • MAP
    Malloy Bridge Rd is closed from I-45 (Malloy Bridge Rd/FM-740) to Bilindsay Rd (Malloy Bridge Rd/FM-740).
    Malloy Bridge Rd is closed from I-45 (Malloy Bridge Rd/FM-740) to Bilindsay Rd (Malloy Bridge Rd/FM-740).
    Start Time: 2025-01-23T03:38:00.000-06:00
    End Time: 2025-02-06T05:46:32.679-06:00
    maplocal traffic
  • MAP
    Jennie Lee Ln is closed from N Prairie Creek Rd to Sandstone Dr.
    Jennie Lee Ln is closed from N Prairie Creek Rd to Sandstone Dr.
    Start Time: 2024-11-15T08:02:26.000-06:00
    End Time: 2025-07-31T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Jennie Lee Ln is closed from Sandstone Dr to N Prairie Creek Rd.
    Jennie Lee Ln is closed from Sandstone Dr to N Prairie Creek Rd.
    Start Time: 2024-11-15T08:02:26.000-06:00
    End Time: 2025-07-31T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on Holystone St from Canada Dr to Greenleaf St.
    Roadwork on Holystone St from Canada Dr to Greenleaf St.
    Start Time: 2025-02-04T08:05:22.000-06:00
    End Time: 2025-02-06T05:46:32.679-06:00
    maplocal traffic
  • MAP
    Roadwork on Malloy Bridge Rd from I-45 (Malloy Bridge Rd/FM-740) to Bilindsay Rd (Malloy Bridge Rd/FM-740).
    Roadwork on Malloy Bridge Rd from I-45 (Malloy Bridge Rd/FM-740) to Bilindsay Rd (Malloy Bridge Rd/FM-740).
    Start Time: 2025-02-02T08:50:30.000-06:00
    End Time: 2025-02-06T05:46:32.679-06:00
    maplocal traffic
  • MAP
    All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. One-way traffic control signal. One-Lane/Two-Way traffic control with flaggers or temporary portable traffic signals 24/7 for segments no longer than 1 mile each.
    All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. One-way traffic control signal. One-Lane/Two-Way traffic control with flaggers or temporary portable traffic signals 24/7 for segments no longer than 1 mile each.
    Start Time: 2025-01-31T13:27:00.000-06:00
    End Time: 2025-03-01T00:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on Malloy Bridge Rd from Bilindsay Rd (Malloy Bridge Rd/FM-740) to I-45 (Malloy Bridge Rd/FM-740).
    Roadwork on Malloy Bridge Rd from Bilindsay Rd (Malloy Bridge Rd/FM-740) to I-45 (Malloy Bridge Rd/FM-740).
    Start Time: 2024-05-05T07:09:30.000-05:00
    End Time: 2025-02-06T05:46:32.679-06:00
    maplocal traffic
  • MAP
    Roadwork at Southwest Dallas.
    Roadwork at Southwest Dallas.
    Start Time: 2025-02-04T03:07:36.000-06:00
    End Time: 2025-02-06T23:59:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork at Southwest Dallas.
    Roadwork at Southwest Dallas.
    Start Time: 2025-02-04T03:07:36.000-06:00
    End Time: 2025-02-06T23:59:00.000-06:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US