Constructions near Search Center
2024-09-24
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPKaltenbrun Rd is closed from Dorothy Rd to E Loop 820 S.
Kaltenbrun Rd is closed from Dorothy Rd to E Loop 820 S.
Start Time: 2024-06-19T04:26:51.000-05:00
End Time: 2024-06-21T23:59:00.000-05:00
map local traffic - MAPKaltenbrun Rd is closed from E Loop 820 S to Dorothy Rd.
Kaltenbrun Rd is closed from E Loop 820 S to Dorothy Rd.
Start Time: 2024-06-19T04:26:01.000-05:00
End Time: 2024-06-21T23:59:00.000-05:00
map local traffic - MAPNighttime closure only. Travel lanes reduced to one lane. Northbound US 287 reduced to one lane between Sublett Road and Little Road.
Nighttime closure only. Travel lanes reduced to one lane. Northbound US 287 reduced to one lane between Sublett Road and Little Road.
Start Time: 2024-06-19T04:00:00.000-05:00
End Time: 2024-06-19T11:00:00.000-05:00
map local traffic - MAPCenter lane closed. Closing inside lane and shoulder to install temporary concrete barrier.
Center lane closed. Closing inside lane and shoulder to install temporary concrete barrier.
Start Time: 2024-06-19T02:00:00.000-05:00
End Time: 2024-06-20T02:00:00.000-05:00
map local traffic - MAPRoadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
Roadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
Start Time: 2024-06-19T00:51:30.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPI-20 W is closed from Bowman Springs Rd/Exit 443 (I-20) to US-287/Mansfield Hwy/Exit 442 (I-20).
I-20 W is closed from Bowman Springs Rd/Exit 443 (I-20) to US-287/Mansfield Hwy/Exit 442 (I-20).
Start Time: 2024-06-18T22:58:00.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPI-820 E is closed from Beach St/Exit 17 (NE Loop 820/I-820) to US-377/Denton Hwy/Exit 19 (I-820).
I-820 E is closed from Beach St/Exit 17 (NE Loop 820/I-820) to US-377/Denton Hwy/Exit 19 (I-820).
Start Time: 2024-06-18T20:43:00.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPRoadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to Meadow Lakes Dr/Exit 20 (I-820).
Roadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to Meadow Lakes Dr/Exit 20 (I-820).
Start Time: 2024-06-18T15:50:01.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPMartin Luther King Fwy is closed from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Martin Luther King Fwy is closed from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Start Time: 2024-06-18T14:44:00.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPGibbs Williams Rd is closed from Boulder Dr to Crepe Myrtle Ln.
Gibbs Williams Rd is closed from Boulder Dr to Crepe Myrtle Ln.
Start Time: 2024-06-18T12:58:29.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPChapin Rd is closed from Williams Rd to Boston Ave.
Chapin Rd is closed from Williams Rd to Boston Ave.
Start Time: 2024-06-18T09:31:30.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPRoadwork from Trinity Blvd exit [25] to Trinity Blvd.
Roadwork from Trinity Blvd exit [25] to Trinity Blvd.
Start Time: 2024-06-18T02:16:25.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPRoadwork from TX-183 E to E Airport Fwy.
Roadwork from TX-183 E to E Airport Fwy.
Start Time: 2024-06-18T01:40:45.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPMAIN LANES not affected. Nighttime closure only. All lanes of the eastbound I-820/SH 121/SH 183 TEXpress lanes from Rufe Snow Dr. to Industrial Blvd. (FM 157) will be closed. Traffic will be maintained using the general purpose lanes.
MAIN LANES not affected. Nighttime closure only. All lanes of the eastbound I-820/SH 121/SH 183 TEXpress lanes from Rufe Snow Dr. to Industrial Blvd. (FM 157) will be closed. Traffic will be maintained using the general purpose lanes.
Start Time: 2024-06-18T00:30:00.000-05:00
End Time: 2024-06-21T10:30:00.000-05:00
map local traffic - MAPRoadwork on I-820 S from Glenview Dr/Pipeline Rd/Exit 23 (I-820) to TX-183/TX-121/TX-10/Exit 24 (I-820).
Roadwork on I-820 S from Glenview Dr/Pipeline Rd/Exit 23 (I-820) to TX-183/TX-121/TX-10/Exit 24 (I-820).
Start Time: 2024-06-17T14:08:30.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPMultiple lane closures. Nighttime closure only. IH 820 SB from Pipeline/Glenview to SH10. 820 SB multiple lanes for level up and surface paving.
Multiple lane closures. Nighttime closure only. IH 820 SB from Pipeline/Glenview to SH10. 820 SB multiple lanes for level up and surface paving.
Start Time: 2024-06-15T02:00:00.000-05:00
End Time: 2024-06-19T11:00:00.000-05:00
map local traffic - MAPRoadwork from exit [442A] to Mansfield Hwy.
Roadwork from exit [442A] to Mansfield Hwy.
Start Time: 2024-06-13T13:50:30.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPRoadwork from Highway 114 to Highway 114 Service Rd.
Roadwork from Highway 114 to Highway 114 Service Rd.
Start Time: 2024-06-12T06:11:30.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPTX-356 / Irving Blvd is closed from I-35E/US-77/Stemmons Fwy (Commonwealth Dr/TX-356) to TX-12 Loop/S Walton Walker Blvd (TX-356).
TX-356 / Irving Blvd is closed from I-35E/US-77/Stemmons Fwy (Commonwealth Dr/TX-356) to TX-12 Loop/S Walton Walker Blvd (TX-356).
Start Time: 2024-06-11T00:00:00.000-05:00
End Time: 2024-08-31T23:59:59.000-05:00
map local traffic - MAPNighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
Nighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
Start Time: 2024-06-10T19:16:30.000-05:00
End Time: 2024-06-19T11:00:00.000-05:00
map local traffic - MAPRoadwork on Summer Creek Dr from W Risinger Rd (N Summer Creek Dr) to Columbus Trl (N Summer Creek Dr).
Roadwork on Summer Creek Dr from W Risinger Rd (N Summer Creek Dr) to Columbus Trl (N Summer Creek Dr).
Start Time: 2024-06-19T00:51:30.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPRoadwork on Airport Fwy from Handley Ederville Rd to Dogwood Park.
Roadwork on Airport Fwy from Handley Ederville Rd to Dogwood Park.
Start Time: 2024-06-18T08:50:00.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPRoadwork from Chadwick Pkwy to Justin-Roanoke.
Roadwork from Chadwick Pkwy to Justin-Roanoke.
Start Time: 2024-06-18T08:49:10.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPRoadwork from Highway 114 to Chadwick Pkwy.
Roadwork from Highway 114 to Chadwick Pkwy.
Start Time: 2024-06-18T08:49:10.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPGibbs Williams Rd is closed from Crepe Myrtle Ln to Boulder Dr.
Gibbs Williams Rd is closed from Crepe Myrtle Ln to Boulder Dr.
Start Time: 2024-06-18T00:02:00.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPS Oak St is closed from W Park Row Dr to Grand Ave.
S Oak St is closed from W Park Row Dr to Grand Ave.
Start Time: 2024-06-17T06:19:57.000-05:00
End Time: 2024-06-19T23:59:00.000-05:00
map local traffic - MAPLitsey Rd is closed from W Highway 114 to W Highway 114 / Briarwyck Pkwy.
Litsey Rd is closed from W Highway 114 to W Highway 114 / Briarwyck Pkwy.
Start Time: 2024-05-16T09:29:00.000-05:00
End Time: 2024-06-19T23:59:00.000-05:00
map local traffic - MAPLitsey Rd is closed from W Highway 114 / Briarwyck Pkwy to W Highway 114.
Litsey Rd is closed from W Highway 114 / Briarwyck Pkwy to W Highway 114.
Start Time: 2024-05-11T08:42:00.000-05:00
End Time: 2024-06-19T06:50:08.071-05:00
map local traffic - MAPRoadwork on W Park Row Dr from S TX-157/S Cooper St (Park Row Dr) to S Collins St (Park Row Dr).
Roadwork on W Park Row Dr from S TX-157/S Cooper St (Park Row Dr) to S Collins St (Park Row Dr).
Start Time: 2024-06-18T13:50:00.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPRoadwork on S Great Southwest Pkwy from W Marshall Dr to W Jefferson St/E Abram St.
Roadwork on S Great Southwest Pkwy from W Marshall Dr to W Jefferson St/E Abram St.
Start Time: 2024-06-18T02:49:00.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-06-17T14:00:00.000-05:00
End Time: 2024-06-22T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-06-17T14:00:00.000-05:00
End Time: 2024-06-22T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-06-17T14:00:00.000-05:00
End Time: 2024-06-22T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-06-17T14:00:00.000-05:00
End Time: 2024-06-22T20:00:00.000-05:00
map local traffic - MAPRoadwork on Sycamore School Rd from Chisholm Trail Pkwy to Columbus Trl.
Roadwork on Sycamore School Rd from Chisholm Trail Pkwy to Columbus Trl.
Start Time: 2024-06-17T06:40:00.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPRoadwork on Summer Creek Dr from Columbus Trl (N Summer Creek Dr) to W Risinger Rd (N Summer Creek Dr).
Roadwork on Summer Creek Dr from Columbus Trl (N Summer Creek Dr) to W Risinger Rd (N Summer Creek Dr).
Start Time: 2024-06-10T14:16:00.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPRoadwork on Summer Creek Dr from Columbus Trl (N Summer Creek Dr) to W Risinger Rd (N Summer Creek Dr).
Roadwork on Summer Creek Dr from Columbus Trl (N Summer Creek Dr) to W Risinger Rd (N Summer Creek Dr).
Start Time: 2024-06-10T14:16:00.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPRoadwork on Esters Rd from Rainier St to Airport Fwy.
Roadwork on Esters Rd from Rainier St to Airport Fwy.
Start Time: 2024-06-07T09:07:00.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPRoadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
Roadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
Start Time: 2024-06-07T08:35:30.000-05:00
End Time: 2024-12-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
Roadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
Start Time: 2024-06-07T08:34:00.000-05:00
End Time: 2024-12-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on Martin Luther King Fwy from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Roadwork on Martin Luther King Fwy from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Start Time: 2024-06-04T20:00:30.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Lanes closed to traffic, detour in place. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Start Time: 2024-05-23T14:00:00.000-05:00
End Time: 2024-12-31T22:00:00.000-06:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. FM 156 (Blue Mound Rd) SB/NB: From 287 to Watauga Dr. Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-05-21T03:41:30.000-05:00
End Time: 2024-07-10T23:55:00.000-05:00
map local traffic - MAPRoadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Roadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Start Time: 2024-05-20T06:52:30.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPRoadwork on N Macarthur Blvd from TX-183/W Airport Fwy (N MacArthur Blvd) to W Northgate Dr (N MacArthur Blvd).
Roadwork on N Macarthur Blvd from TX-183/W Airport Fwy (N MacArthur Blvd) to W Northgate Dr (N MacArthur Blvd).
Start Time: 2024-05-03T10:23:00.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPRoadwork on N Macarthur Blvd from W Northgate Dr (N MacArthur Blvd) to TX-183/W Airport Fwy (N MacArthur Blvd).
Roadwork on N Macarthur Blvd from W Northgate Dr (N MacArthur Blvd) to TX-183/W Airport Fwy (N MacArthur Blvd).
Start Time: 2024-04-25T17:47:34.000-05:00
End Time: 2024-06-19T06:50:08.072-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Lanes closed to traffic, detour in place. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Start Time: 2024-03-12T14:00:00.000-05:00
End Time: 2024-12-31T22:00:00.000-06:00
map local traffic - MAPRoadwork on North Fwy from Keller Hicks Rd to Josh Rd.
Roadwork on North Fwy from Keller Hicks Rd to Josh Rd.
Start Time: 2023-12-21T06:03:00.000-06:00
End Time: 2024-06-24T14:34:00.000-05:00
map local traffic - MAPRoadwork on North Fwy from Walker to Churchill Park Way.
Roadwork on North Fwy from Walker to Churchill Park Way.
Start Time: 2023-12-21T06:03:00.000-06:00
End Time: 2024-06-24T14:34:00.000-05:00
map local traffic - MAPRoadwork on Oak Grove Rd from Barron Way to Everman Pkwy.
Roadwork on Oak Grove Rd from Barron Way to Everman Pkwy.
Start Time: 2024-06-10T21:38:30.000-05:00
End Time: 2024-09-11T21:37:06.000-05:00
map local traffic - MAPRoadworks scheduled 19/06/2024 - 18/08/2024
Roadworks scheduled 19/06/2024 - 18/08/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-08-17T20:00:24.000-05:00
map local traffic - MAPRoadworks scheduled 19/06/2024 - 18/08/2024
Roadworks scheduled 19/06/2024 - 18/08/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-08-17T20:00:24.000-05:00
map local traffic - MAPBridge closure at TX-183 E.
Bridge closure at TX-183 E.
Start Time: 2024-06-19T00:48:30.000-05:00
End Time: 2024-06-21T23:59:00.000-05:00
map local traffic - MAPRoadwork at Bedford Euless Rd.
Roadwork at Bedford Euless Rd.
Start Time: 2024-06-18T08:23:45.000-05:00
End Time: 2024-06-20T23:59:00.000-05:00
map local traffic - MAPNighttime closure only. Travel lanes reduced to one lane. Northbound US 287 reduced to one lane between Sublett Road and Little Road.
Nighttime closure only. Travel lanes reduced to one lane. Northbound US 287 reduced to one lane between Sublett Road and Little Road.
Start Time: 2024-06-19T04:00:00.000-05:00
End Time: 2024-06-19T11:00:00.000-05:00
map local traffic