know it ahead ™ ...

Interstate 205 Descriptions

North

Oregon:
I-205 starts in Tualatin, Oregon, at a directional T interchange with I-5. From I-5, the highway heads east towards the towns of West Linn and Oregon City where it crosses the Willamette River between interchanges for Oregon Route 43 (OR 43) and OR 99E. In West Linn, there is a view point exit for the northbound lanes, providing a scenic overlook of Willamette Falls. In Oregon City, the highway curves northward, crossing the Clackamas River concurrent with OR 213 and entering the town of Gladstone.

OR 213 splits from I-205 again at exit 13 in Clackamas, and the next exit north on I-205 provides access to Sunnyside Road and Clackamas Town Center. North of Clackamas, the freeway crosses the Portland city limits, passing through the eastern portion of the city, where it intersects I-84 and U.S. Route 26 (US 26). On the northern side of the city, just before crossing the Columbia River on the Glenn Jackson Bridge, I-205 has an exit for Airport Way, which provides access to Portland International Airport.

On the Washington side of the river, I-205 serves the eastern parts of the city of Vancouver, and has interchanges with two freeways, State Route 14 (SR 14) just north of the Columbia, and SR 500 near Westfield Vancouver. From the SR 500 interchange, I-205 curves northwest back towards I-5, where it ends in the town of Salmon Creek. This interchange with I-5 is not complete, as there is no direct access from I-5 northbound to I-205 southbound, or from I-205 northbound to I-5 southbound. These missing movements are completed via Northeast 134th Street, one exit to the south. A bicycle and pedestrian trail follows I-205 for much of its distance in the Portland metropolitan area, and connects to the Springwater Corridor trail near the Foster Road exit.

History

The final section of I-205 to be completed, the section between SE Division Street and the southern interchange of the Glenn Jackson Bridge over the Columbia River, opened to traffic in March 1983. The approximately 10-mile (16 km) section on the Washington side of the river had opened in summer 1982, and the bridge opened in December 1982.

Construction of I-205 included a graded but unfinished transitway between SE Foster Road and NE Columbia Boulevard. The section between NE Columbia Boulevard and the I-205/I-84 junction became part of the MAX Red Line, and the section from E Burnside Street to SE Foster Road is used as part of the Green Line. The short portion between these sections was used by the first rail line, now the Blue Line.

Future

Because of tremendous growth in the Portland metropolitan area and the suburb of Vancouver, the Washington and Oregon departments of transportation (WSDOT, ODOT) are currently planning improvements on I-205 to improve traffic flow between the two states. In Vancouver, WSDOT and Clark County's Regional Transportation Commission are planning several new ramps to new arterials, grade-separating existing ramps with new ramps, and additional lanes. In Portland, ODOT is beginning to plan improvements, but no details have been released yet.

Another solution being floated around is a light rail line serving most or all the entire I-205 corridor, though the plan is being met with opposition from Clark County residents. Additionally, statements have been made by the Columbia River Crossing group that the Glenn Jackson Bridge was not properly engineered to carry light rail.

South






Thank you for using Roadnow

Roadnow US