Constructions near Search Center
2025-03-06
Roadnow
click anywhere on map to find more Constructions

Current Constructions
- MAPN 90th Pl is closed from N 90th St to N Frank Lloyd Wright Blvd.
N 90th Pl is closed from N 90th St to N Frank Lloyd Wright Blvd.
Start Time: 2025-03-06T01:36:33.000-07:00
End Time: 2025-03-08T23:59:00.000-07:00
map local traffic - MAPN 90th Pl is closed from N Frank Lloyd Wright Blvd to N 90th St.
N 90th Pl is closed from N Frank Lloyd Wright Blvd to N 90th St.
Start Time: 2025-03-06T01:36:33.000-07:00
End Time: 2025-03-08T23:59:00.000-07:00
map local traffic - MAPContractor will use a flagman operation on Onyx to install speed humps 0830-1700
Contractor will use a flagman operation on Onyx to install speed humps 0830-1700
Start Time: 2025-03-06T00:00:00.000-07:00
End Time: 2025-03-07T00:00:00.000-07:00
map local traffic - MAPContractor will close the left lanes in both directions on 59av .0830-1600
Contractor will close the left lanes in both directions on 59av .0830-1600
Start Time: 2025-03-06T00:00:00.000-07:00
End Time: 2025-03-14T01:00:00.000-06:00
map local traffic - MAPThunderbird High School is closed from N 19th Ave to W Thunderbird Rd.
Thunderbird High School is closed from N 19th Ave to W Thunderbird Rd.
Start Time: 2025-03-05T21:23:57.000-07:00
End Time: 2025-03-07T23:59:00.000-07:00
map local traffic - MAPRoad marking operations on ramp from I-17 Southbound to Dove Valley Rd . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Road marking operations on ramp from I-17 Southbound to Dove Valley Rd . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Start Time: 2025-03-05T21:00:00.000-07:00
End Time: 2025-03-06T04:59:00.000-07:00
map local traffic - MAPRoad marking operations on ramp from Dove Valley Rd to I-17 Southbound . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Road marking operations on ramp from Dove Valley Rd to I-17 Southbound . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Start Time: 2025-03-05T21:00:00.000-07:00
End Time: 2025-03-06T04:59:00.000-07:00
map local traffic - MAPN 32nd St is closed from E Greenway Rd to E Thunderbird Rd.
N 32nd St is closed from E Greenway Rd to E Thunderbird Rd.
Start Time: 2025-03-05T19:51:00.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPRoadway reduced to one lane on I-17 Northbound from W Anthem Way (MP 229) to Sunset Point (MP 252) Width Restriction: 13ft Speed Restriction: 55mph 11/10/2024 6:00 PM to 5/30/2025 6:00 AM
Roadway reduced to one lane on I-17 Northbound from W Anthem Way (MP 229) to Sunset Point (MP 252) Width Restriction: 13ft Speed Restriction: 55mph 11/10/2024 6:00 PM to 5/30/2025 6:00 AM
Start Time: 2025-02-27T10:02:00.000-07:00
End Time: 2025-03-06T23:59:00.000-07:00
map local traffic - MAPRoadway reduced to one lane on I-17 Northbound from W Anthem Way (MP 229) to Sunset Point (MP 252) Width Restriction: 13ft Speed Restriction: 55mph 11/10/2024 6:00 PM to 5/30/2025 6:00 AM
Roadway reduced to one lane on I-17 Northbound from W Anthem Way (MP 229) to Sunset Point (MP 252) Width Restriction: 13ft Speed Restriction: 55mph 11/10/2024 6:00 PM to 5/30/2025 6:00 AM
Start Time: 2025-02-27T10:02:00.000-07:00
End Time: 2025-03-06T23:59:00.000-07:00
map local traffic - MAPRoadway reduced to one lane on I-17 Southbound from Rest Area (MP 253) to Anthem Way (MP 229) Width Restriction: 13ft Height Restriction: 15ft Speed Restriction: 55mph 11/11/2024 7:00 AM to 5/31/2025 7:00 AM
Roadway reduced to one lane on I-17 Southbound from Rest Area (MP 253) to Anthem Way (MP 229) Width Restriction: 13ft Height Restriction: 15ft Speed Restriction: 55mph 11/11/2024 7:00 AM to 5/31/2025 7:00 AM
Start Time: 2025-02-27T09:54:00.000-07:00
End Time: 2025-03-06T23:59:00.000-07:00
map local traffic - MAPRoadway reduced to one lane on I-17 Southbound from Rest Area (MP 253) to Anthem Way (MP 229) Width Restriction: 13ft Height Restriction: 15ft Speed Restriction: 55mph 11/11/2024 7:00 AM to 5/31/2025 7:00 AM
Roadway reduced to one lane on I-17 Southbound from Rest Area (MP 253) to Anthem Way (MP 229) Width Restriction: 13ft Height Restriction: 15ft Speed Restriction: 55mph 11/11/2024 7:00 AM to 5/31/2025 7:00 AM
Start Time: 2025-02-27T09:44:00.000-07:00
End Time: 2025-03-06T23:59:00.000-07:00
map local traffic - MAPRoad marking operations on ramp from Dove Valley Rd to I-17 Southbound . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Road marking operations on ramp from Dove Valley Rd to I-17 Southbound . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Start Time: 2025-03-06T00:00:00.000-07:00
End Time: 2025-03-06T04:59:00.000-07:00
map local traffic - MAPOld Carefree Hwy - road construction - Replacement of bearing pads on the bridge. Expect eastbound lane closure/restriction.
Old Carefree Hwy - road construction - Replacement of bearing pads on the bridge. Expect eastbound lane closure/restriction.
Start Time: 2025-03-06T00:00:00.000-07:00
End Time: 2025-03-06T11:00:00.000-07:00
map local traffic - MAPRoadwork on N Scottsdale Rd from Pinnacle Peak Rd to Jomax Rd.
Roadwork on N Scottsdale Rd from Pinnacle Peak Rd to Jomax Rd.
Start Time: 2025-03-05T17:28:30.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPRoadwork from W Beardsley Rd to AZ-101 Loop E.
Roadwork from W Beardsley Rd to AZ-101 Loop E.
Start Time: 2025-03-04T07:25:30.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPContractor will use shoulder and sidewalk closures in neighborhood. 0800-1600
Contractor will use shoulder and sidewalk closures in neighborhood. 0800-1600
Start Time: 2025-03-03T00:00:00.000-07:00
End Time: 2025-04-07T01:00:00.000-06:00
map local traffic - MAPContractor will close the northbound right lane and westbound shift on Brown.0830-1600
Contractor will close the northbound right lane and westbound shift on Brown.0830-1600
Start Time: 2025-02-27T00:00:00.000-07:00
End Time: 2025-03-07T00:00:00.000-07:00
map local traffic - MAPN 85th Ave is closed from W Grand Ave to W Peoria Ave.
N 85th Ave is closed from W Grand Ave to W Peoria Ave.
Start Time: 2025-02-24T11:23:00.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPslurry seal
slurry seal
Start Time: 2025-02-24T00:00:00.000-07:00
End Time: 2025-03-31T01:00:00.000-06:00
map local traffic - MAPContractor will close the alley between 57dr-57av N of Glendale
Contractor will close the alley between 57dr-57av N of Glendale
Start Time: 2025-02-17T00:00:00.000-07:00
End Time: 2025-03-15T01:00:00.000-06:00
map local traffic - MAPN Bullard Ave is closed from W Bell Rd to W Greenway Rd.
N Bullard Ave is closed from W Bell Rd to W Greenway Rd.
Start Time: 2025-02-14T07:09:30.000-07:00
End Time: 2025-03-06T05:36:26.000-07:00
map local traffic - MAPContractor will use flagman and directional closures on 69av for paving. 0800-1600
Contractor will use flagman and directional closures on 69av for paving. 0800-1600
Start Time: 2025-02-03T00:00:00.000-07:00
End Time: 2025-03-14T01:00:00.000-06:00
map local traffic - MAPRoadwork on N 85th Ave from W Grand Ave to W Peoria Ave.
Roadwork on N 85th Ave from W Grand Ave to W Peoria Ave.
Start Time: 2025-03-05T16:28:30.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPRoadwork from N El Mirage Rd to W Westland Rd.
Roadwork from N El Mirage Rd to W Westland Rd.
Start Time: 2025-03-05T15:28:30.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPRoadwork on N Scottsdale Rd from Jomax Rd to Dynamite Blvd.
Roadwork on N Scottsdale Rd from Jomax Rd to Dynamite Blvd.
Start Time: 2025-03-05T09:28:00.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPRoadwork on E Rio Verde Dr from N 122nd St to N 132nd St.
Roadwork on E Rio Verde Dr from N 122nd St to N 132nd St.
Start Time: 2025-03-04T10:26:30.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPRoadwork on E Sonoran Desert Dr from E Dove Valley Rd to N Cave Creek Rd.
Roadwork on E Sonoran Desert Dr from E Dove Valley Rd to N Cave Creek Rd.
Start Time: 2025-03-04T09:26:30.000-07:00
End Time: 2025-03-06T05:43:47.116-07:00
map local traffic - MAPGROVERS AVE - road construction - Sewer Manhole Repair
GROVERS AVE - road construction - Sewer Manhole Repair
Start Time: 2025-03-04T07:30:00.000-07:00
End Time: 2025-03-07T14:00:00.000-07:00
map local traffic - MAP99th Ave - road construction - Road work, southbound right lane closed. Slow down in work zones
99th Ave - road construction - Road work, southbound right lane closed. Slow down in work zones
Start Time: 2025-03-03T08:30:00.000-07:00
End Time: 2025-03-15T17:00:00.000-06:00
map local traffic - MAP67th Ave - road construction - Joint trench project. Expect Northbound and Southbound lane restrictions.
67th Ave - road construction - Joint trench project. Expect Northbound and Southbound lane restrictions.
Start Time: 2025-02-17T08:30:00.000-07:00
End Time: 2025-03-12T17:30:00.000-06:00
map local traffic - MAPBELL RD - road construction - SE
BELL RD - road construction - SE
Start Time: 2025-02-11T00:00:00.000-07:00
End Time: 2025-03-11T01:00:00.000-06:00
map local traffic - MAP51ST AVE - road construction - Mill and Overlay Street
51ST AVE - road construction - Mill and Overlay Street
Start Time: 2025-02-10T08:30:00.000-07:00
End Time: 2025-03-28T16:30:00.000-06:00
map local traffic - MAPPYRAMID PEAK PKY - road construction - Replacing air release valves in vaults
PYRAMID PEAK PKY - road construction - Replacing air release valves in vaults
Start Time: 2025-03-03T05:30:00.000-07:00
End Time: 2025-03-07T15:30:00.000-07:00
map local traffic - MAPGREENWAY RD - road construction - AS & GM
GREENWAY RD - road construction - AS & GM
Start Time: 2025-03-03T00:00:00.000-07:00
End Time: 2025-03-12T01:00:00.000-06:00
map local traffic - MAP19TH AVE - road construction - GM & AS
19TH AVE - road construction - GM & AS
Start Time: 2025-03-03T00:00:00.000-07:00
End Time: 2025-03-12T01:00:00.000-06:00
map local traffic - MAP31ST AVE - road construction - Concrete
31ST AVE - road construction - Concrete
Start Time: 2025-02-27T08:30:00.000-07:00
End Time: 2025-03-14T16:30:00.000-06:00
map local traffic - MAP32ND ST - road construction - PH
32ND ST - road construction - PH
Start Time: 2025-02-24T00:00:00.000-07:00
End Time: 2025-03-14T01:00:00.000-06:00
map local traffic - MAPSTRAIGHT ARROW LN - road construction - Trenching and Excavating
STRAIGHT ARROW LN - road construction - Trenching and Excavating
Start Time: 2025-02-24T00:00:00.000-07:00
End Time: 2025-03-13T01:00:00.000-06:00
map local traffic - MAPJOMAX RD - road construction - Signal Loops
JOMAX RD - road construction - Signal Loops
Start Time: 2025-02-22T08:30:00.000-07:00
End Time: 2025-03-07T16:00:00.000-07:00
map local traffic - MAP28TH DR - road construction - REPLACE FIRE HYDRANT
28TH DR - road construction - REPLACE FIRE HYDRANT
Start Time: 2025-02-22T06:00:00.000-07:00
End Time: 2025-03-08T14:30:00.000-07:00
map local traffic - MAPMOUNTAIN VIEW RD - road construction - TR / BO / AS / CC
MOUNTAIN VIEW RD - road construction - TR / BO / AS / CC
Start Time: 2025-02-20T00:00:00.000-07:00
End Time: 2025-03-21T01:00:00.000-06:00
map local traffic - MAPBELL RD - road construction - BO, AS, CC, PH, TR, UG
BELL RD - road construction - BO, AS, CC, PH, TR, UG
Start Time: 2025-02-13T00:00:00.000-07:00
End Time: 2025-03-12T01:00:00.000-06:00
map local traffic - MAP43RD AVE - road construction - GM, CC, AS
43RD AVE - road construction - GM, CC, AS
Start Time: 2025-02-12T00:00:00.000-07:00
End Time: 2025-04-30T01:00:00.000-06:00
map local traffic - MAPNORTH VALLEY PKWY - road construction - BO // TR // RT // PC // PH
NORTH VALLEY PKWY - road construction - BO // TR // RT // PC // PH
Start Time: 2025-01-24T00:00:00.000-07:00
End Time: 2025-03-21T01:00:00.000-06:00
map local traffic - MAPRoad marking operations on ramp from I-17 Southbound to 303-LOOP Southbound . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Road marking operations on ramp from I-17 Southbound to 303-LOOP Southbound . All lanes closed. 3/5/2025 9:00 PM to 3/6/2025 5:00 AM
Start Time: 2025-03-05T21:00:00.000-07:00
End Time: 2025-03-06T04:59:00.000-07:00
map local traffic