Constructions near I 10 exit 150a
2025-02-14
Roadnow
click anywhere on map to find more Constructions
![](https://roadnow.com/img/traffic_legend.png)
Current Constructions
- MAPConstruction work on I-10 Eastbound from Maricopa Pinal County Line (MP 171) to Maricopa Pinal County Line (MP 172) . 1 Left lane closed. 2/13/2025 9:00 PM to 2/14/2025 5:00 AM
Construction work on I-10 Eastbound from Maricopa Pinal County Line (MP 171) to Maricopa Pinal County Line (MP 172) . 1 Left lane closed. 2/13/2025 9:00 PM to 2/14/2025 5:00 AM
Start Time: 2025-02-14T00:00:00.000-07:00
End Time: 2025-02-14T04:59:00.000-07:00
map local traffic - MAPExit ramp closed off ramp from 202-LOOP Eastbound to S Gilbert Rd . All lanes closed. 1/22/2025 12:00 AM to 3/3/2025 11:00 PM
Exit ramp closed off ramp from 202-LOOP Eastbound to S Gilbert Rd . All lanes closed. 1/22/2025 12:00 AM to 3/3/2025 11:00 PM
Start Time: 2025-01-21T23:30:00.000-07:00
End Time: 2025-03-20T07:00:00.000-06:00
map local traffic - MAPSan Marcos Pl - road construction - Road closures on San Marcos Pl. at Commonwealth Ave to Buffalo St. Fencing around the park.
San Marcos Pl - road construction - Road closures on San Marcos Pl. at Commonwealth Ave to Buffalo St. Fencing around the park.
Start Time: 2025-02-12T17:00:00.000-07:00
End Time: 2025-02-15T17:00:00.000-07:00
map local traffic - MAPE Baars Ave is closed from E Cavalry Ct to S Pewter Dr.
E Baars Ave is closed from E Cavalry Ct to S Pewter Dr.
Start Time: 2025-02-11T22:50:51.000-07:00
End Time: 2025-02-14T23:59:00.000-07:00
map local traffic - MAPAlma School Rd - road construction - Installing new cox comm fiber to the New Carolinas, with going from pedestal to vault on the SB back
Alma School Rd - road construction - Installing new cox comm fiber to the New Carolinas, with going from pedestal to vault on the SB back
Start Time: 2025-02-05T17:00:00.000-07:00
End Time: 2025-02-19T17:00:00.000-07:00
map local traffic - MAPS Washington St - road construction - New Gas Installations
S Washington St - road construction - New Gas Installations
Start Time: 2025-02-04T17:00:00.000-07:00
End Time: 2025-02-17T17:00:00.000-07:00
map local traffic - MAPCHANDLER BLVD - road construction - Sewer & Water Installation
CHANDLER BLVD - road construction - Sewer & Water Installation
Start Time: 2025-02-03T08:30:00.000-07:00
End Time: 2025-02-28T15:00:00.000-07:00
map local traffic - MAP48TH ST - road construction - AS, CC
48TH ST - road construction - AS, CC
Start Time: 2025-02-01T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAPCentre Pointe Pkwy - road construction - Midblock closure
Centre Pointe Pkwy - road construction - Midblock closure
Start Time: 2025-01-30T17:00:00.000-07:00
End Time: 2025-03-30T18:00:00.000-06:00
map local traffic - MAPConstruction zone on S Mercy Rd Both from E Bonanza Rd to E Pecos Rd. Starting 2025-01-28 8:55 AM and ending 2025-02-17 8:56 AM.
Construction zone on S Mercy Rd Both from E Bonanza Rd to E Pecos Rd. Starting 2025-01-28 8:55 AM and ending 2025-02-17 8:56 AM.
Start Time: 2025-01-28T08:55:00.000-07:00
End Time: 2025-02-17T08:56:00.000-07:00
map local traffic - MAPDokota Pl - road construction - Trenching/ bore
Dokota Pl - road construction - Trenching/ bore
Start Time: 2025-01-22T17:00:00.000-07:00
End Time: 2025-02-27T17:00:00.000-07:00
map local traffic - MAPW INNOVATIONS ST - road construction - BORE / RESTORATION
W INNOVATIONS ST - road construction - BORE / RESTORATION
Start Time: 2025-01-22T17:00:00.000-07:00
End Time: 2025-02-26T17:00:00.000-07:00
map local traffic - MAPEllis St - road construction - BORE / RESTORATION
Ellis St - road construction - BORE / RESTORATION
Start Time: 2025-01-22T17:00:00.000-07:00
End Time: 2025-02-26T17:00:00.000-07:00
map local traffic - MAPDokota Pl - road construction - Trenching/ bore
Dokota Pl - road construction - Trenching/ bore
Start Time: 2025-01-22T17:00:00.000-07:00
End Time: 2025-02-27T17:00:00.000-07:00
map local traffic - MAPJasmine Dr - road construction - Trenching/ bore
Jasmine Dr - road construction - Trenching/ bore
Start Time: 2025-01-22T17:00:00.000-07:00
End Time: 2025-02-27T17:00:00.000-07:00
map local traffic - MAPW Frye Rd - road construction - SEWER REHABILIATION FOR FRYEROAD
W Frye Rd - road construction - SEWER REHABILIATION FOR FRYEROAD
Start Time: 2025-01-20T17:00:00.000-07:00
End Time: 2025-02-27T17:00:00.000-07:00
map local traffic - MAPRyan Rd - road construction - Bore
Ryan Rd - road construction - Bore
Start Time: 2025-01-19T17:00:00.000-07:00
End Time: 2025-02-20T17:00:00.000-07:00
map local traffic - MAPEnterprise Pl - road construction - INSTALING FIVER
Enterprise Pl - road construction - INSTALING FIVER
Start Time: 2025-01-16T17:00:00.000-07:00
End Time: 2025-02-20T17:00:00.000-07:00
map local traffic - MAPJuniper Dr - road construction - INSTALING FIVER
Juniper Dr - road construction - INSTALING FIVER
Start Time: 2025-01-16T17:00:00.000-07:00
End Time: 2025-02-20T17:00:00.000-07:00
map local traffic - MAPEnterprise Pl - road construction - INSTALING FIVER
Enterprise Pl - road construction - INSTALING FIVER
Start Time: 2025-01-16T17:00:00.000-07:00
End Time: 2025-02-20T17:00:00.000-07:00
map local traffic - MAPOregon - road construction - Neighborhood Bore / Pothole
Oregon - road construction - Neighborhood Bore / Pothole
Start Time: 2024-12-29T17:00:00.000-07:00
End Time: 2025-02-27T17:00:00.000-07:00
map local traffic - MAPGrove - road construction - Bore / Push Pull
Grove - road construction - Bore / Push Pull
Start Time: 2024-12-02T17:00:00.000-07:00
End Time: 2025-02-20T17:00:00.000-07:00
map local traffic - MAPE ERIE ST - road construction - UTILITY WORK
E ERIE ST - road construction - UTILITY WORK
Start Time: 2024-10-20T18:00:00.000-06:00
End Time: 2025-04-14T18:00:00.000-06:00
map local traffic - MAPConsolidated is closed from N Gilbert Rd to E McKellips Rd.
Consolidated is closed from N Gilbert Rd to E McKellips Rd.
Start Time: 2025-02-14T02:02:37.000-07:00
End Time: 2025-02-21T23:59:00.000-07:00
map local traffic - MAPConsolidated is closed from E McKellips Rd to N Gilbert Rd.
Consolidated is closed from E McKellips Rd to N Gilbert Rd.
Start Time: 2025-02-14T02:02:37.000-07:00
End Time: 2025-02-21T23:59:00.000-07:00
map local traffic - MAP2520 S Alma School - road construction - Northbound/southbound Alma School alternating right or left lane closed with speed reduced to 35 MPH when pedestrians are detoured into the roadway for utility crossing/installation by 3D Pipelines.
2520 S Alma School - road construction - Northbound/southbound Alma School alternating right or left lane closed with speed reduced to 35 MPH when pedestrians are detoured into the roadway for utility crossing/installation by 3D Pipelines.
Start Time: 2025-02-14T01:30:00.000-07:00
End Time: 2025-03-05T09:00:00.000-07:00
map local traffic - MAPW Bell de Mar Dr is closed from S Kyrene Rd to S Farmer Ave.
W Bell de Mar Dr is closed from S Kyrene Rd to S Farmer Ave.
Start Time: 2025-02-14T00:39:01.000-07:00
End Time: 2025-02-16T23:59:00.000-07:00
map local traffic - MAPContractor will use shoulder and sidewalk clsoures in the neighborhood area for installing Metro Net Fiber. 0800-1600
Contractor will use shoulder and sidewalk clsoures in the neighborhood area for installing Metro Net Fiber. 0800-1600
Start Time: 2025-02-14T00:00:00.000-07:00
End Time: 2025-03-08T00:00:00.000-07:00
map local traffic - MAPN Pima Rd is closed from Phoenix to N Grayhawk Dr.
N Pima Rd is closed from Phoenix to N Grayhawk Dr.
Start Time: 2025-02-13T23:47:29.000-07:00
End Time: 2025-02-15T23:59:00.000-07:00
map local traffic - MAPW 3rd Pl is closed from N Date to N Country Club Dr.
W 3rd Pl is closed from N Date to N Country Club Dr.
Start Time: 2025-02-13T23:00:12.000-07:00
End Time: 2025-02-16T23:59:00.000-07:00
map local traffic - MAPW 3rd Pl is closed from N Country Club Dr to N Date.
W 3rd Pl is closed from N Country Club Dr to N Date.
Start Time: 2025-02-13T23:00:12.000-07:00
End Time: 2025-02-16T23:59:00.000-07:00
map local traffic - MAPOn ramp closed on ramp from N Pima Rd to 101-LOOP Southbound 1/7/2025 12:05 AM to 3/8/2025 11:55 PM
On ramp closed on ramp from N Pima Rd to 101-LOOP Southbound 1/7/2025 12:05 AM to 3/8/2025 11:55 PM
Start Time: 2025-01-07T00:05:00.000-07:00
End Time: 2025-02-14T23:59:00.000-07:00
map local traffic - MAPJOKAKE ST - road construction - BO, SC, RT
JOKAKE ST - road construction - BO, SC, RT
Start Time: 2025-02-14T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAPWASHINGTON ST - road construction - BO
WASHINGTON ST - road construction - BO
Start Time: 2025-02-14T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAP27TH AVE - road construction - AS, CC
27TH AVE - road construction - AS, CC
Start Time: 2025-02-14T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAPRoadwork on E McKellips Rd from AZ-101/Pima Fwy to N Alma School Rd.
Roadwork on E McKellips Rd from AZ-101/Pima Fwy to N Alma School Rd.
Start Time: 2025-02-13T20:34:00.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPRoadwork from Phoenix to E Thomas Rd.
Roadwork from Phoenix to E Thomas Rd.
Start Time: 2025-02-13T02:53:39.000-07:00
End Time: 2025-02-15T23:59:00.000-07:00
map local traffic - MAPN 42nd Pl is closed at E Thunderbird Rd.
N 42nd Pl is closed at E Thunderbird Rd.
Start Time: 2025-02-13T00:02:00.000-07:00
End Time: 2025-02-15T23:59:00.000-07:00
map local traffic - MAPE Portland St is closed from E Portland St to N 40th St / E Portland St.
E Portland St is closed from E Portland St to N 40th St / E Portland St.
Start Time: 2025-02-12T23:59:00.000-07:00
End Time: 2025-02-14T23:59:00.000-07:00
map local traffic - MAPE Beck Ln is closed from N 58th Pl to E Greenway Rd / N 57th St.
E Beck Ln is closed from N 58th Pl to E Greenway Rd / N 57th St.
Start Time: 2025-02-12T22:05:24.000-07:00
End Time: 2025-02-14T23:59:00.000-07:00
map local traffic - MAPW Hermosa Dr is closed from S Mill Ave / E Hermosa Dr to S Mill Ave.
W Hermosa Dr is closed from S Mill Ave / E Hermosa Dr to S Mill Ave.
Start Time: 2025-02-12T00:59:14.000-07:00
End Time: 2025-02-14T23:59:00.000-07:00
map local traffic - MAPRoadwork from Phoenix to S Alma School Rd.
Roadwork from Phoenix to S Alma School Rd.
Start Time: 2025-02-12T00:14:08.000-07:00
End Time: 2025-02-14T23:59:00.000-07:00
map local traffic - MAPRoadwork from S Alma School Rd to Phoenix.
Roadwork from S Alma School Rd to Phoenix.
Start Time: 2025-02-12T00:14:08.000-07:00
End Time: 2025-02-14T23:59:00.000-07:00
map local traffic - MAPN Longmore Rd is closed from Salt River to E Lehi Rd.
N Longmore Rd is closed from Salt River to E Lehi Rd.
Start Time: 2025-02-11T22:05:39.000-07:00
End Time: 2025-02-18T23:59:00.000-07:00
map local traffic - MAPRoadwork from Red Mountain Fwy to Phoenix.
Roadwork from Red Mountain Fwy to Phoenix.
Start Time: 2025-02-11T06:47:08.000-07:00
End Time: 2025-02-18T23:59:00.000-07:00
map local traffic - MAPE Houston Ave is closed from N Claiborne Ave to N Higley Rd.
E Houston Ave is closed from N Claiborne Ave to N Higley Rd.
Start Time: 2025-02-10T13:21:00.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPContractor will close Palmaire between 59av-58dr but leaving business access. 24hrs
Contractor will close Palmaire between 59av-58dr but leaving business access. 24hrs
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-03-01T00:00:00.000-07:00
map local traffic - MAPContractor will close the shoulder on east side of 74dr at Wescott
Contractor will close the shoulder on east side of 74dr at Wescott
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-24T00:00:00.000-07:00
map local traffic - MAPContractor will close the shoulders on Vermont 71dr-72av
Contractor will close the shoulders on Vermont 71dr-72av
Start Time: 2025-02-05T00:00:00.000-07:00
End Time: 2025-02-15T00:00:00.000-07:00
map local traffic - MAPContractor will use flagman operation on 44av Orchid-Seldon
Contractor will use flagman operation on 44av Orchid-Seldon
Start Time: 2025-02-05T00:00:00.000-07:00
End Time: 2025-02-15T00:00:00.000-07:00
map local traffic - MAPW McDowell Rd is closed from Center Rd to N 75th Ave.
W McDowell Rd is closed from Center Rd to N 75th Ave.
Start Time: 2025-02-04T16:55:00.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPContractor will use a flagman on Wethersfield between 63av-65av .0830-1600
Contractor will use a flagman on Wethersfield between 63av-65av .0830-1600
Start Time: 2025-02-04T00:00:00.000-07:00
End Time: 2025-02-15T00:00:00.000-07:00
map local traffic - MAPContractor will close the alley to rehab manhole 24hrs
Contractor will close the alley to rehab manhole 24hrs
Start Time: 2025-02-03T00:00:00.000-07:00
End Time: 2025-02-15T00:00:00.000-07:00
map local traffic - MAPContractor will use flagman and directional closures on 69av for paving. 0800-1600
Contractor will use flagman and directional closures on 69av for paving. 0800-1600
Start Time: 2025-02-03T00:00:00.000-07:00
End Time: 2025-03-14T01:00:00.000-06:00
map local traffic - MAPN Longmore Rd is closed from E Lehi Rd to Salt River.
N Longmore Rd is closed from E Lehi Rd to Salt River.
Start Time: 2025-02-01T18:48:30.000-07:00
End Time: 2025-02-18T23:59:00.000-07:00
map local traffic - MAPContractor will use shoulder and sidewalk closures in neighborhood .0800-1600
Contractor will use shoulder and sidewalk closures in neighborhood .0800-1600
Start Time: 2025-01-30T00:00:00.000-07:00
End Time: 2025-02-15T00:00:00.000-07:00
map local traffic - MAP99th Ave - road construction - Road work, road closed.
99th Ave - road construction - Road work, road closed.
Start Time: 2025-01-13T00:00:00.000-07:00
End Time: 2025-04-25T13:00:00.000-06:00
map local traffic - MAPRoadwork on E University Dr from S Rural Rd to S Mill Ave (University Dr).
Roadwork on E University Dr from S Rural Rd to S Mill Ave (University Dr).
Start Time: 2025-02-13T12:33:00.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPRoadwork on N Pima Rd from AZ-101 Loop N / E Frank Lloyd Wright Blvd to N Northsight Blvd.
Roadwork on N Pima Rd from AZ-101 Loop N / E Frank Lloyd Wright Blvd to N Northsight Blvd.
Start Time: 2025-02-13T07:32:30.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPCAVE CREEK RD - road construction - PC
CAVE CREEK RD - road construction - PC
Start Time: 2025-02-13T00:00:00.000-07:00
End Time: 2025-02-27T00:00:00.000-07:00
map local traffic - MAPBELL RD - road construction - BO, AS, CC, PH, TR, UG
BELL RD - road construction - BO, AS, CC, PH, TR, UG
Start Time: 2025-02-13T00:00:00.000-07:00
End Time: 2025-03-12T01:00:00.000-06:00
map local traffic - MAPUNION HILLS DR - road construction - BO, UG, PH
UNION HILLS DR - road construction - BO, UG, PH
Start Time: 2025-02-13T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAP24TH ST - road construction - SE
24TH ST - road construction - SE
Start Time: 2025-02-13T00:00:00.000-07:00
End Time: 2025-02-27T00:00:00.000-07:00
map local traffic - MAPTATUM BLVD - road construction - SE
TATUM BLVD - road construction - SE
Start Time: 2025-02-13T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAP9TH ST - road construction - GM
9TH ST - road construction - GM
Start Time: 2025-02-13T00:00:00.000-07:00
End Time: 2025-03-01T00:00:00.000-07:00
map local traffic - MAPCAMELBACK RD - road construction - PAVING
CAMELBACK RD - road construction - PAVING
Start Time: 2025-02-12T08:30:00.000-07:00
End Time: 2025-02-26T16:00:00.000-07:00
map local traffic - MAPROESER RD - road construction - Micro Seal
ROESER RD - road construction - Micro Seal
Start Time: 2025-02-12T08:30:00.000-07:00
End Time: 2025-02-28T16:00:00.000-07:00
map local traffic - MAPCAMPBELL AVE - road construction - Asphalt/Concrete Restoration
CAMPBELL AVE - road construction - Asphalt/Concrete Restoration
Start Time: 2025-02-12T08:30:00.000-07:00
End Time: 2025-02-28T16:00:00.000-07:00
map local traffic - MAP2727 W University - road construction - Westbound University restriction for SRP and City of Tempe
2727 W University - road construction - Westbound University restriction for SRP and City of Tempe
Start Time: 2025-02-12T01:30:00.000-07:00
End Time: 2025-02-14T09:00:00.000-07:00
map local traffic - MAP75TH AVE - road construction - water SERVICE
75TH AVE - road construction - water SERVICE
Start Time: 2025-02-12T00:00:00.000-07:00
End Time: 2025-03-28T01:00:00.000-06:00
map local traffic - MAPRoadwork on N Alma School Rd from E McDowell Rd to E McKellips Rd.
Roadwork on N Alma School Rd from E McDowell Rd to E McKellips Rd.
Start Time: 2025-02-11T15:29:00.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPRoadwork on E McKellips Rd from N Higley Rd to N Greenfield Rd.
Roadwork on E McKellips Rd from N Higley Rd to N Greenfield Rd.
Start Time: 2025-02-11T13:28:30.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPBELL RD - road construction - SE
BELL RD - road construction - SE
Start Time: 2025-02-11T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAPRoadwork from Phoenix to W Broadway Rd.
Roadwork from Phoenix to W Broadway Rd.
Start Time: 2025-02-10T14:28:00.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPBUCKEYE RD - road construction - Asphalt/Concrete Restoration
BUCKEYE RD - road construction - Asphalt/Concrete Restoration
Start Time: 2025-02-10T08:30:00.000-07:00
End Time: 2025-02-28T16:00:00.000-07:00
map local traffic - MAP51ST AVE - road construction - Mill and Overlay Street
51ST AVE - road construction - Mill and Overlay Street
Start Time: 2025-02-10T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAPRoadwork on S 99th Ave from W Broadway Rd to W Southern Ave.
Roadwork on S 99th Ave from W Broadway Rd to W Southern Ave.
Start Time: 2025-02-09T14:13:30.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAP99th Ave - road construction - Road work, southbound right lane closed. Slow down in work zones
99th Ave - road construction - Road work, southbound right lane closed. Slow down in work zones
Start Time: 2025-02-03T08:30:00.000-07:00
End Time: 2025-02-17T16:00:00.000-07:00
map local traffic - MAP160 S Gilbert - road construction - Alternating lane closures on Gilbert for Ansco to install Gigapower Fiber.
160 S Gilbert - road construction - Alternating lane closures on Gilbert for Ansco to install Gigapower Fiber.
Start Time: 2025-02-03T01:30:00.000-07:00
End Time: 2025-02-28T09:00:00.000-07:00
map local traffic - MAP2835 E Brown - road construction - Eastbound right lane closure for Gonzalez to install LSC Fiber.
2835 E Brown - road construction - Eastbound right lane closure for Gonzalez to install LSC Fiber.
Start Time: 2025-01-20T01:30:00.000-07:00
End Time: 2025-02-28T09:00:00.000-07:00
map local traffic - MAP7TH AVE - road construction - Slurry Seal
7TH AVE - road construction - Slurry Seal
Start Time: 2025-01-13T08:30:00.000-07:00
End Time: 2025-02-21T16:00:00.000-07:00
map local traffic - MAPBASELINE RD - road construction - WATER CONNECTION
BASELINE RD - road construction - WATER CONNECTION
Start Time: 2025-01-13T08:30:00.000-07:00
End Time: 2025-02-21T15:30:00.000-07:00
map local traffic - MAPSouthern Ave - road construction - Road work, right lane closed. Slow down in work zones
Southern Ave - road construction - Road work, right lane closed. Slow down in work zones
Start Time: 2025-01-13T00:00:00.000-07:00
End Time: 2025-02-28T12:00:00.000-07:00
map local traffic - MAP5249 E Brown - road construction - Eastbound right lane closure for Gonzalez installing LSC Fiber.
5249 E Brown - road construction - Eastbound right lane closure for Gonzalez installing LSC Fiber.
Start Time: 2024-12-19T01:30:00.000-07:00
End Time: 2025-02-21T09:00:00.000-07:00
map local traffic - MAP100 S Greenfield - road construction - Traffic restricted to one lane each way from Edgewood to Diamond for Garney to install a reuse pipeline.
100 S Greenfield - road construction - Traffic restricted to one lane each way from Edgewood to Diamond for Garney to install a reuse pipeline.
Start Time: 2024-11-30T17:00:00.000-07:00
End Time: 2025-03-31T10:00:00.000-06:00
map local traffic - MAP700 S Greenfield - road construction - Traffic restricted to one lane each way from Edgewood to Diamond for Garney to install a reuse pipeline.
700 S Greenfield - road construction - Traffic restricted to one lane each way from Edgewood to Diamond for Garney to install a reuse pipeline.
Start Time: 2024-11-04T17:00:00.000-07:00
End Time: 2025-03-28T17:59:00.000-06:00
map local traffic - MAP1739 E Broadway - road construction - 24 hour restriction: Eastbound Broadway right lane closed.Daytime restriction only: Eastbound Broadway right lane closed with traffic shift into center two-way left turn lane for City of Mesa gas utility repair. No eastbound/westbound Broadway left turns at Williams. Hall closed with detour using 5th Ave.
1739 E Broadway - road construction - 24 hour restriction: Eastbound Broadway right lane closed.Daytime restriction only: Eastbound Broadway right lane closed with traffic shift into center two-way left turn lane for City of Mesa gas utility repair. No eastbound/westbound Broadway left turns at Williams. Hall closed with detour using 5th Ave.
Start Time: 2024-09-10T02:30:00.000-06:00
End Time: 2025-02-28T09:00:00.000-07:00
map local traffic - MAPRoadwork on S Central Ave from Baseline Rd to Broadway Rd.
Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
Start Time: 2024-04-24T10:14:30.000-06:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPRoadwork on S Central Ave from Broadway Rd to Baseline Rd.
Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
Start Time: 2024-01-10T12:00:00.000-07:00
End Time: 2025-02-14T05:13:42.343-07:00
map local traffic - MAPChilton - road construction - Paving
Chilton - road construction - Paving
Start Time: 2025-02-11T17:00:00.000-07:00
End Time: 2025-02-20T17:00:00.000-07:00
map local traffic - MAPArizona Ave - road construction - Paving
Arizona Ave - road construction - Paving
Start Time: 2025-02-11T17:00:00.000-07:00
End Time: 2025-02-20T17:00:00.000-07:00
map local traffic - MAPNORTHVIEW AVE - road construction - Concrete
NORTHVIEW AVE - road construction - Concrete
Start Time: 2025-02-11T09:30:00.000-07:00
End Time: 2025-02-25T16:30:00.000-07:00
map local traffic - MAPOSBORN RD - road construction - Manhole Rehab
OSBORN RD - road construction - Manhole Rehab
Start Time: 2025-02-11T08:30:00.000-07:00
End Time: 2025-02-24T16:00:00.000-07:00
map local traffic - MAPGREENWAY RD - road construction - GM, AS
GREENWAY RD - road construction - GM, AS
Start Time: 2025-02-11T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAPMOHAVE ST - road construction - Concrete Panel
MOHAVE ST - road construction - Concrete Panel
Start Time: 2025-02-10T08:30:00.000-07:00
End Time: 2025-02-21T16:00:00.000-07:00
map local traffic - MAPBROADWAY RD - road construction - Micro Seal
BROADWAY RD - road construction - Micro Seal
Start Time: 2025-02-10T08:30:00.000-07:00
End Time: 2025-02-28T16:00:00.000-07:00
map local traffic - MAP63RD AVE - road construction - Asphalt Patch Work
63RD AVE - road construction - Asphalt Patch Work
Start Time: 2025-02-10T08:30:00.000-07:00
End Time: 2025-02-28T16:00:00.000-07:00
map local traffic - MAP1ST AVE - road construction - SE
1ST AVE - road construction - SE
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-27T00:00:00.000-07:00
map local traffic - MAPBELL RD - road construction - PH
BELL RD - road construction - PH
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-25T00:00:00.000-07:00
map local traffic - MAPBASELINE RD - road construction - New Driveway Installation
BASELINE RD - road construction - New Driveway Installation
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAP103RD AVE - road construction - APS - UTILITY TRENCHING
103RD AVE - road construction - APS - UTILITY TRENCHING
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-03-07T00:00:00.000-07:00
map local traffic - MAPBELL RD - road construction - PH
BELL RD - road construction - PH
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-25T00:00:00.000-07:00
map local traffic - MAP3RD AVE - road construction - SE
3RD AVE - road construction - SE
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAP9TH ST - road construction - PC
9TH ST - road construction - PC
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAP56TH ST - road construction - PH
56TH ST - road construction - PH
Start Time: 2025-02-10T00:00:00.000-07:00
End Time: 2025-02-25T00:00:00.000-07:00
map local traffic - MAPNORTHERN AVE - road construction - base excavation
NORTHERN AVE - road construction - base excavation
Start Time: 2025-02-08T09:30:00.000-07:00
End Time: 2025-02-17T00:00:00.000-07:00
map local traffic - MAP3RD AVE - road construction - Asphalt R&R
3RD AVE - road construction - Asphalt R&R
Start Time: 2025-02-07T08:30:00.000-07:00
End Time: 2025-02-21T13:30:00.000-07:00
map local traffic - MAPSHERMAN ST - road construction - Relocate electric
SHERMAN ST - road construction - Relocate electric
Start Time: 2025-02-07T07:00:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAP3RD AVE - road construction - SE
3RD AVE - road construction - SE
Start Time: 2025-02-07T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAP2ND AVE - road construction - Relocate electric
2ND AVE - road construction - Relocate electric
Start Time: 2025-02-07T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAP19TH AVE - road construction - GM
19TH AVE - road construction - GM
Start Time: 2025-02-07T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAPFILLMORE ST - road construction - bo
FILLMORE ST - road construction - bo
Start Time: 2025-02-07T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAPTHUNDERBIRD RD - road construction - Concrete
THUNDERBIRD RD - road construction - Concrete
Start Time: 2025-02-06T09:30:00.000-07:00
End Time: 2025-02-20T16:30:00.000-07:00
map local traffic - MAPBALL PARK BLVD - road construction - Traffic Control for MLB Spring Training
BALL PARK BLVD - road construction - Traffic Control for MLB Spring Training
Start Time: 2025-02-06T08:00:00.000-07:00
End Time: 2025-03-24T20:00:00.000-06:00
map local traffic - MAPPOLK ST - road construction - BO
POLK ST - road construction - BO
Start Time: 2025-02-06T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAPCAVE CREEK RD - road construction - AE SE
CAVE CREEK RD - road construction - AE SE
Start Time: 2025-02-06T00:00:00.000-07:00
End Time: 2025-02-20T00:00:00.000-07:00
map local traffic - MAP35TH AVE - road construction - BO
35TH AVE - road construction - BO
Start Time: 2025-02-06T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAP51ST DR - road construction - Sewer Rehab 13-16-323_13-17-228
51ST DR - road construction - Sewer Rehab 13-16-323_13-17-228
Start Time: 2025-02-05T08:30:00.000-07:00
End Time: 2025-02-19T15:30:00.000-07:00
map local traffic - MAP51ST AVE - road construction - wer rehab 13-16-323_13-17228
51ST AVE - road construction - wer rehab 13-16-323_13-17228
Start Time: 2025-02-05T08:30:00.000-07:00
End Time: 2025-02-19T15:30:00.000-07:00
map local traffic - MAP86TH DR - road construction - AS, BO, CC, PH, PC, RT, TR
86TH DR - road construction - AS, BO, CC, PH, PC, RT, TR
Start Time: 2025-02-05T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAPWASHINGTON ST - road construction - UG, PC
WASHINGTON ST - road construction - UG, PC
Start Time: 2025-02-05T00:00:00.000-07:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAPOAK ST - road construction - Asphalt/Concrete Restoration
OAK ST - road construction - Asphalt/Concrete Restoration
Start Time: 2025-02-04T08:30:00.000-07:00
End Time: 2025-02-21T16:00:00.000-07:00
map local traffic - MAP15TH AVE - road construction - Rehabilitation of COP Sewer Manhole (17-25-417)
15TH AVE - road construction - Rehabilitation of COP Sewer Manhole (17-25-417)
Start Time: 2025-01-28T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAPBROADWAY RD - road construction - DRY UTILITY WORK
BROADWAY RD - road construction - DRY UTILITY WORK
Start Time: 2025-01-27T08:30:00.000-07:00
End Time: 2025-02-24T16:00:00.000-07:00
map local traffic - MAPHIGHLAND AVE - road construction - BO, TR, AS, CC
HIGHLAND AVE - road construction - BO, TR, AS, CC
Start Time: 2025-01-27T00:00:00.000-07:00
End Time: 2025-02-24T00:00:00.000-07:00
map local traffic - MAP10TH ST - road construction - sidewalk improvement
10TH ST - road construction - sidewalk improvement
Start Time: 2025-01-27T00:00:00.000-07:00
End Time: 2025-02-21T00:00:00.000-07:00
map local traffic - MAP15TH ST - road construction - BO/TR/AS/CC
15TH ST - road construction - BO/TR/AS/CC
Start Time: 2025-01-27T00:00:00.000-07:00
End Time: 2025-02-24T00:00:00.000-07:00
map local traffic - MAPCAMPBELL AVE - road construction - BO/TR/AS/CC
CAMPBELL AVE - road construction - BO/TR/AS/CC
Start Time: 2025-01-27T00:00:00.000-07:00
End Time: 2025-02-24T00:00:00.000-07:00
map local traffic - MAPMEADOWBROOK AVE - road construction - Sewer manhole rehab large diameter
MEADOWBROOK AVE - road construction - Sewer manhole rehab large diameter
Start Time: 2025-01-24T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAPINDIAN SCHOOL RD - road construction - Sewer manhole rehab large diameter
INDIAN SCHOOL RD - road construction - Sewer manhole rehab large diameter
Start Time: 2025-01-24T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAPDEER VALLEY DR - road construction - Installation of traffic signal equipment
DEER VALLEY DR - road construction - Installation of traffic signal equipment
Start Time: 2025-01-23T09:30:00.000-07:00
End Time: 2025-02-20T15:30:00.000-07:00
map local traffic - MAPPORTLAND ST - road construction - Concrete and Pavement Restoration
PORTLAND ST - road construction - Concrete and Pavement Restoration
Start Time: 2025-01-22T08:30:00.000-07:00
End Time: 2025-02-19T00:00:00.000-07:00
map local traffic - MAPVAN BUREN ST - road construction - Asphalt/Concrete Restoration
VAN BUREN ST - road construction - Asphalt/Concrete Restoration
Start Time: 2025-01-22T07:00:00.000-07:00
End Time: 2025-02-28T16:00:00.000-07:00
map local traffic - MAP49TH DR - road construction - Repair/rebuild sewer manhole
49TH DR - road construction - Repair/rebuild sewer manhole
Start Time: 2025-01-21T08:30:00.000-07:00
End Time: 2025-02-15T16:00:00.000-07:00
map local traffic - MAPJACKSON ST - road construction - Sewer Tap Installation
JACKSON ST - road construction - Sewer Tap Installation
Start Time: 2025-01-20T08:30:00.000-07:00
End Time: 2025-03-31T17:00:00.000-06:00
map local traffic - MAPRose Ln - road construction - Lane shifts due to road work. Slow down in work zones
Rose Ln - road construction - Lane shifts due to road work. Slow down in work zones
Start Time: 2025-01-20T07:00:00.000-07:00
End Time: 2025-02-14T16:00:00.000-07:00
map local traffic - MAPMEADOWBROOK AVE - road construction - Storm Drain Installation
MEADOWBROOK AVE - road construction - Storm Drain Installation
Start Time: 2025-01-20T00:00:00.000-07:00
End Time: 2025-03-01T00:00:00.000-07:00
map local traffic - MAP74TH AVE - road construction - Sewer manhole rehab large diameter
74TH AVE - road construction - Sewer manhole rehab large diameter
Start Time: 2025-01-17T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAPWIER AVE - road construction - ADA Ramp / Patch back
WIER AVE - road construction - ADA Ramp / Patch back
Start Time: 2025-01-13T08:30:00.000-07:00
End Time: 2025-02-20T16:00:00.000-07:00
map local traffic - MAP15TH AVE - road construction - sewer rehab JOC
15TH AVE - road construction - sewer rehab JOC
Start Time: 2025-01-13T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAP1200 N Mesa DR - road construction - Northbound and Southbound Mesa Dr restrictions at the Canal for Talis
1200 N Mesa DR - road construction - Northbound and Southbound Mesa Dr restrictions at the Canal for Talis
Start Time: 2025-01-13T01:30:00.000-07:00
End Time: 2025-02-14T09:00:00.000-07:00
map local traffic - MAPTHOMAS RD - road construction - Sewer manhole rehab large diameter
THOMAS RD - road construction - Sewer manhole rehab large diameter
Start Time: 2025-01-10T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAPTHOMAS RD - road construction - Sewer manhole rehab large diameter
THOMAS RD - road construction - Sewer manhole rehab large diameter
Start Time: 2025-01-10T08:30:00.000-07:00
End Time: 2025-02-28T15:30:00.000-07:00
map local traffic - MAP75TH AVE - road construction - Sewer Rehab
75TH AVE - road construction - Sewer Rehab
Start Time: 2025-01-10T00:00:00.000-07:00
End Time: 2025-03-28T01:00:00.000-06:00
map local traffic - MAPConstruction work on E Houston Ave Both from N Higley Rd to N Banning Ave. Starting 2025-01-02 12:00 AM and ending 2025-02-15 12:00 AM.
Construction work on E Houston Ave Both from N Higley Rd to N Banning Ave. Starting 2025-01-02 12:00 AM and ending 2025-02-15 12:00 AM.
Start Time: 2025-01-02T00:00:00.000-07:00
End Time: 2025-02-15T00:00:00.000-07:00
map local traffic - MAP6TH AVE - road construction - Concrete Pour
6TH AVE - road construction - Concrete Pour
Start Time: 2024-11-30T07:00:00.000-07:00
End Time: 2025-09-01T17:00:00.000-06:00
map local traffic - MAPALAMEDA RD - road construction - LANDSCAPING
ALAMEDA RD - road construction - LANDSCAPING
Start Time: 2024-10-11T01:00:00.000-06:00
End Time: 2025-02-28T00:00:00.000-07:00
map local traffic - MAPRoadwork at N Tatum Blvd.
Roadwork at N Tatum Blvd.
Start Time: 2025-02-13T23:51:12.000-07:00
End Time: 2025-02-16T23:59:00.000-07:00
map local traffic